Genuine ship equipment and spare parts made in Korea, China, Japan and Europe.
[email protected] Part number: 0
Component: ESWBS Expanded Ship Work Breakdown Structure
Maker:
Ship Spare Parts:
0 ESWBS Expanded Ship Work Breakdown Structure
– ESWBS 1000 – COMBAT CAPABILITIES (OFFENSIVE AND DEFENSIVE),
– ESWBS 10000 – HULL STRUCTURE, GENERAL,
– ESWBS 10010 – HULL ACCESSES, TEMPORARY (DELETED SEE 8636),
– ESWBS 10011 – HULL ACCESSES, TEMPORARY (DELETED SEE 86361),
– ESWBS 10100 – GENERAL ARRANGEMENT-STRUCTURAL DRAWINGS,
– ESWBS 1100 – AIR WEAPONS VS AIR TARGETS,
– ESWBS 11000 – SHELL AND SUPPORTING STRUCTURE,
– ESWBS 11010 – HULL, UNDERWATER BODY,
– ESWBS 11011 – HULL, UNDERWATER BODY,
– ESWBS 11020 – HULL STRUCTURE ABOVE UNDERWATER BODY,
– ESWBS 11021 – HULL STRUCTURE ABOVE UNDERWATER BODY,
– ESWBS 11100 – SHELL PLATING, SURFACE SHIP AND SUBMARINE PRESSURE HULL,
– ESWBS 11110 – SHELL PLATING, SUBMARINE PRESSURE HULL,
– ESWBS 11111 – SHELL PLATING SUBMARINE PRESSURE HULL,
– ESWBS 11200 – SHELL PLATING, SUBMARINE NON-PRESSURE HULL,
– ESWBS 11210 – SHELL PLATING SUBMARINE NON-PRESSURE HULL,
– ESWBS 11211 – SHELL PLATING SUBMARINE NON-PRESSURE HULL,
– ESWBS 11300 – INNER BOTTOM,
– ESWBS 11400 – SHELL APPENDAGES,
– ESWBS 11410 – SHELL APPENDAGES,
– ESWBS 11411 – SHELL APPENDAGES,
– ESWBS 11500 – STANCHIONS,
– ESWBS 11800 – LONGITUDINAL AND TRANSVERSE SUBMARINE NON-PRESSURE HULL,
– ESWBS 11810 – LONGITUDINAL AND TRANSVERSE SUBMARINE NON-PRESSURE HULL,
– ESWBS 11811 – LONGITUDINAL AND TRANSVERSE SUBMARINE NON-PRESSURE HULL,
– ESWBS 11900 – LIFT SYSTEM FLEXIBLE SKIRTS AND SEALS,
– ESWBS 11910 – LIFT SYSTEM FLEXIBLE SKIRTS AND SEALS,
– ESWBS 11911 – FLEXIBLE SKIRTS AND SEALS, LIFT SYSTEM,
– ESWBS 1200 – AIR WEAPONS VS SURFACE TARGETS,
– ESWBS 12000 – HULL STRUCTURAL BULKHEADS,
– ESWBS 12010 – STRUCTURAL BULKHEADS LESS SUPERSTRUCTURE,
– ESWBS 12011 – STRUCTURAL BULKHEADS LESS SUPERSTRUCTURE,
– ESWBS 12100 – LONGITUDINAL STRUCTURAL BULKHEADS,
– ESWBS 12110 – LONGITUDINAL STRUCTURAL BULKHEADS,
– ESWBS 12111 – LONGITUDINAL STRUCTURAL BULKHEADS,
– ESWBS 12200 – TRANSVERSE STRUCTURAL BULKHEADS,
– ESWBS 12220 – TRANSVERSE STRUCTURAL BULKHEADS (SURFACE SHIPS),
– ESWBS 12221 – TRANSVERSE STRUCTURAL BULKHEADS (SURFACE SHIPS),
– ESWBS 12300 – TRUNKS AND ENCLOSURES,
– ESWBS 12310 – TANKS,
– ESWBS 12311 – FUEL OIL TANKS,
– ESWBS 12312 – JP-5 TANKS,
– ESWBS 12313 – FEED WATER TANKS,
– ESWBS 12314 – POTABLE WATER TANKS,
– ESWBS 12315 – LUBE OIL TANKS,
– ESWBS 12316 – BALLAST TANKS,
– ESWBS 12317 – CONTAMINATED OIL TANKS,
– ESWBS 12318 – MOGAS TANKS,
– ESWBS 12319 – WASTE TANKS,
– ESWBS 12320 – TRUNKS AND VOIDS,
– ESWBS 12321 – TRUNKS,
– ESWBS 12322 – VOIDS AND COFFERDAMS,
– ESWBS 12610 – BUILT-IN SOFT TANKS,
– ESWBS 12611 – BUILT-IN SOFT TANKS,
– ESWBS 12620 – BUILT-IN INTERMEDIATE TANKS,
– ESWBS 12621 – BUILT-IN INTERMEDIATE TANKS,
– ESWBS 1300 – AIR WEAPONS VS UNDERWATER TARGETS,
– ESWBS 13000 – HULL DECKS,
– ESWBS 13010 – HULL DECKS,
– ESWBS 13011 – HULL DECKS,
– ESWBS 13100 – MAIN DECK,
– ESWBS 13110 – MAIN DECK,
– ESWBS 13111 – MAIN DECK,
– ESWBS 13200 – 2ND DECK,
– ESWBS 13300 – 3RD DECK,
– ESWBS 13400 – 4TH DECK,
– ESWBS 13500 – 5TH DECK AND DECKS BELOW,
– ESWBS 13600 – 01 HULL DECK (FORECASTLE AND POOP DECKS),
– ESWBS 13700 – 02 HULL DECK,
– ESWBS 13800 – 03 HULL DECK,
– ESWBS 13900 – 04 HULL DECK AND HULL DECKS ABOVE,
– ESWBS 1400 – SURFACE WEAPONS VS AIR TARGETS,
– ESWBS 14000 – HULL PLATFORMS AND FLATS,
– ESWBS 14010 – HULL PLATFORM AND FLATS,
– ESWBS 14011 – HULL PLATFORM AND FLATS,
– ESWBS 14100 – 1ST PLATFORM,
– ESWBS 14200 – 2ND PLATFORM,
– ESWBS 14300 – 3RD PLATFORM,
– ESWBS 14400 – 4TH PLATFORM,
– ESWBS 14500 – 5TH PLATFORM,
– ESWBS 14900 – FLATS,
– ESWBS 1500 – SURFACE WEAPONS VS SURFACE TARGETS,
– ESWBS 15000 – DECK HOUSE STRUCTURE,
– ESWBS 15010 – SUPERSTRUCTURE,
– ESWBS 15011 – SUPERSTRUCTURE,
– ESWBS 15100 – DECKHOUSE STRUCTURE TO FIRST LEVEL,
– ESWBS 15200 – 1ST DECKHOUSE LEVEL,
– ESWBS 15210 – 1ST DECKHOUSE LEVEL,
– ESWBS 15211 – 1ST DECKHOUSE,
– ESWBS 15300 – 2ND DECKHOUSE LEVEL,
– ESWBS 15400 – 3RD DECKHOUSE LEVEL,
– ESWBS 15500 – 4TH DECKHOUSE LEVEL,
– ESWBS 15600 – 5TH DECKHOUSE LEVEL,
– ESWBS 15700 – 6TH DECKHOUSE LEVEL,
– ESWBS 15800 – 7TH DECKHOUSE LEVEL,
– ESWBS 15900 – 8TH DECKHOUSE LEVEL AND ABOVE,
– ESWBS 1600 – SURFACE WEAPONS VS UNDERWATER TARGETS,
– ESWBS 16000 – SPECIAL STRUCTURES,
– ESWBS 16100 – STRUCTURAL CASTINGS, FORGINGS, AND EQUIV. WELDMENTS,
– ESWBS 16110 – STRUCTURAL CASTINGS, FORGINGS AND EQUIV. WELDMENTS,
– ESWBS 16111 – STRUCTURAL CASTINGS, FORGINGS AND EQUIV. WELDMENTS,
– ESWBS 16300 – SEA CHESTS,
– ESWBS 16310 – SEA CHESTS,
– ESWBS 16311 – SEA CHESTS,
– ESWBS 16400 – BALLISTIC PLATING,
– ESWBS 16410 – BALLISTIC PLATING,
– ESWBS 16411 – BALLISTIC PLATING,
– ESWBS 16500 – SONAR DOMES,
– ESWBS 16510 – SONAR DOME,
– ESWBS 16511 – SONAR DOME,
– ESWBS 16600 – SPONSONS,
– ESWBS 16700 – HULL STRUCTURAL CLOSURES,
– ESWBS 16710 – HULL STRUCTURAL CLOSURES (WATERTIGHT),
– ESWBS 16711 – HULL STRL. CLOSURES (WTRTT.), ARMD., AT., FUELTIGHT, M.O.,
– ESWBS 16800 – DECKHOUSE STRUCTURAL CLOSURES,
– ESWBS 16810 – DECKHOUSE STRUCTURAL CLOSURES (WATERTIGHT),
– ESWBS 16811 – DECKHOUSE STRUCTURAL CLOSURES (WATERTIGHT), ARMORED, M.O.,
– ESWBS 16812 – DECKHOUSE STRUCTURAL CLOSURES (WATERTIGHT, CPS),
– ESWBS 16900 – SPECIAL PURPOSE CLOSURES AND STRUCTURES,
– ESWBS 16910 – SPECIAL PURPOSE CLOSURES AND STRUCTURES,
– ESWBS 16911 – SPECIAL PURPOSE CLOSURES AND STRUCTURES,
– ESWBS 1700 – UNDERWATER WEAPONS VS SURFACE TARGETS,
– ESWBS 17000 – MASTS, KINGPOSTS, AND SERVICE PLATFORMS,
– ESWBS 17100 – MASTS, TOWERS, TETRAPODS,
– ESWBS 17110 – MASTS,
– ESWBS 17111 – MASTS,
– ESWBS 17200 – KINGPOSTS AND SUPPORT FRAMES,
– ESWBS 17210 – KINGPOSTS,
– ESWBS 17211 – KINGPOSTS,
– ESWBS 17900 – SERVICE PLATFORMS,
– ESWBS 1800 – UNDERWATER WEAPONS VS UNDERWATER TARGETS,
– ESWBS 18000 – FOUNDATIONS,
– ESWBS 18100 – HULL STRUCTURE FOUNDATIONS,
– ESWBS 18200 – PROPULSION PLANT FOUNDATIONS,
– ESWBS 18300 – ELECTRIC PLANT FOUNDATIONS,
– ESWBS 18400 – COMMAND AND SURVEILLANCE FOUNDATIONS,
– ESWBS 18410 – COMMAND AND SURVEILLANCE FOUNDATIONS,
– ESWBS 18411 – COMMAND AND SURVEILLANCE FOUNDATIONS,
– ESWBS 18500 – AUXILIARY SYSTEMS FOUNDATIONS,
– ESWBS 18600 – OUTFIT AND FURNISHINGS FOUNDATIONS,
– ESWBS 18700 – ARMAMENT FOUNDATIONS,
– ESWBS 19000 – SPECIAL PURPOSE SYSTEMS,
– ESWBS 19100 – BALLAST, FIXED OR FLUID, AND BUOYANCY UNITS,
– ESWBS 19110 – BALLAST, PERMANENT,
– ESWBS 19111 – BALLAST, PERMANENT,
– ESWBS 19200 – COMPARTMENT TESTING,
– ESWBS 19210 – TESTING, COMPARTMENT (EXCLUSIVE OF TANK TESTING),
– ESWBS 19211 – TESTING, COMPARTMENT (EXCLUSIVE OF TANK TESTING),
– ESWBS 19500 – ERECTION OF SUB SECTIONS (PROGRESS REPORT ONLY),
– ESWBS 19800 – FREE FLOODING LIQUIDS,
– ESWBS 19900 – HULL REPAIR PARTS AND SPECIAL TOOLS,
– ESWBS 19910 – HULL MISCELLANEOUS PARTS,
– ESWBS 19911 – HULL MISCELLANEOUS PARTS,
– ESWBS 19920 – HULL SPECIAL TOOLS,
– ESWBS 19921 – HULL SPECIAL TOOLS,
– ESWBS 19921 – ,
– ESWBS 2000 – STRATEGIC AND SPECIAL CAPABILITIES,
– ESWBS 20000 – PROPULSION PLANT, GENERAL,
– ESWBS 20100 – GENERAL ARRANGEMENT – PROPULSION DRAWINGS,
– ESWBS 20200 – MACHINERY PLANT CENTRAL CONTROL SYSTEMS,
– ESWBS 2100 – SURFACE BASED DETERRENTS,
– ESWBS 21000 – ENERGY GENERATING SYSTEM (NUCLEAR),
– ESWBS 21200 – NUCLEAR STEAM GENERATOR,
– ESWBS 21300 – REACTORS,
– ESWBS 21400 – REACTOR COOLANT SYSTEM,
– ESWBS 21500 – REACTOR COOLANT SERVICE SYSTEMS,
– ESWBS 21600 – REACTOR PLANT AUXILIARY SYSTEMS,
– ESWBS 21700 – NUCLEAR POWER CONTROL AND INSTRUMENTATION,
– ESWBS 21800 – RADIATION SHIELDING (PRIMARY),
– ESWBS 21900 – RADIATION SHIELDING (SECONDARY),
– ESWBS 2200 – UNDERWATER BASED DETERRENTS,
– ESWBS 22000 – ENERGY GENERATING SYSTEM (NON-NUCLEAR),
– ESWBS 22100 – PROPULSION BOILERS,
– ESWBS 22110 – BOILERS, PROPULSION,
– ESWBS 2211X – BOILERS, PROPULSION – SHAFT X,
– ESWBS 22120 – BOILER, MANUAL/AUTOMATIC CONTROLS,
– ESWBS 2212X – BOILER, MANUAL/AUTOMATIC CONTROLS – SHAFT X,
– ESWBS 22130 – BOILER BLOW SYSTEMS,
– ESWBS 2213X – PIPING, BOILER BLOW – SHAFT X,
– ESWBS 22140 – BOILER STEAM ESCAPE SYSTEMS,
– ESWBS 22141 – BOILER STEAM ESCAPE SYSTEMS,
– ESWBS 22150 – ENERGY CYCLE RECOVERY PROPULSION SYSTEM,
– ESWBS 22151 – RANKINE CYCLE ENERGY RECOVERY (RACER) PROPULSION SYSTEM,
– ESWBS 22200 – GAS GENERATORS,
– ESWBS 22300 – MAIN PROPULSION BATTERIES,
– ESWBS 22310 – MAIN STORAGE BATTERY,
– ESWBS 22311 – MAIN STORAGE BATTERY, BANK #1,
– ESWBS 22312 – MAIN STORAGE BATTERY, BANK #2,
– ESWBS 22320 – HYDROGEN DETECTION SYSTEM (HY),
– ESWBS 22321 – HYDROGEN DETECTION SYSTEM (HY),
– ESWBS 22330 – BATTERY AIR FLOW SYSTEM (HG),
– ESWBS 22331 – BATTERY AIR FLOW SYSTEM (HG),
– ESWBS 22400 – MAIN PROPULSION FUEL CELLS,
– ESWBS 2300 – AMPHIBIOUS WARFARE,
– ESWBS 23000 – PROPULSION UNITS,
– ESWBS 23100 – PROPULSION STEAM TURBINES,
– ESWBS 23110 – PROPULSION STEAM TURBINES, MAIN,
– ESWBS 2311X – PROPULSION STEAM TURBINES, HP & LP, MAIN – SHAFT X,
– ESWBS 23200 – PROPULSION STEAM ENGINES,
– ESWBS 23300 – PROPULSION INTERNAL COMBUSTION ENGINES,
– ESWBS 23310 – PROPULSION DIESEL ENGINES, MAIN,
– ESWBS 23311 – PROPULSION DIESEL ENGINE, MAIN – NO. 1,
– ESWBS 23312 – PROPULSION DIESEL ENGINE, MAIN – NO. 2,
– ESWBS 23313 – PROPULSION DIESEL ENGINE, MAIN – NO. 3,
– ESWBS 23314 – PROPULSION DIESEL ENGINE, MAIN – NO. 4,
– ESWBS 23315 – PROPULSION DIESEL ENGINE, MAIN – NO. 5,
– ESWBS 23316 – PROPULSION DIESEL ENGINE, MAIN – NO. 6,
– ESWBS 23400 – PROPULSION GAS TURBINES,
– ESWBS 23410 – PROPULSION GAS TURBINES, MAIN,
– ESWBS 23411 – PROPULSION GAS TURBINE, MAIN – NO. 1,
– ESWBS 23412 – PROPULSION GAS TURBINE, MAIN – NO. 2,
– ESWBS 23413 – PROPULSION GAS TURBINE, MAIN – NO. 3,
– ESWBS 23414 – PROPULSION GAS TURBINE, MAIN – NO. 4,
– ESWBS 23420 – PROPULSION GAS TURBINES, SUPPORT SYSTEM,
– ESWBS 23421 – GAS TURBINE STARTING AIR SYSTEM,
– ESWBS 23422 – LUBE OIL FILL AND STORAGE SYSTEM,
– ESWBS 23423 – FREE STANDING ELECTRONIC ENCLOSURE (FSEE),
– ESWBS 23424 – GAS TURBINE WATER WASH SYSTEM,
– ESWBS 23425 – UNINTERRUPTED POWER SUPPLY,
– ESWBS 23426 – GAS TURBINE STARTING SYSTEM,
– ESWBS 23500 – ELECTRIC PROPULSION,
– ESWBS 23510 – PROPULSION GENERATORS, MAIN,
– ESWBS 23511 – PROPULSION GENERATOR, MAIN – NO. 1,
– ESWBS 23512 – PROPULSION GENERATOR, MAIN – NO. 2,
– ESWBS 23513 – PROPULSION GENERATOR, MAIN – NO. 3,
– ESWBS 23514 – PROPULSION GENERATOR, MAIN – NO. 4,
– ESWBS 23515 – PROPULSION GENERATOR, MAIN – NO. 5,
– ESWBS 23516 – PROPULSION GENERATOR, MAIN – NO. 6,
– ESWBS 2351X – PROPULSION GENERATOR, MAIN – NO. X,
– ESWBS 23520 – PROPULSION MOTORS, MAIN,
– ESWBS 23521 – PROPULSION MOTOR, MAIN SHAFT 1,
– ESWBS 23522 – PROPULSION MOTOR, MAIN SHAFT 2,
– ESWBS 23523 – PROPULSION MOTOR, MAIN SHAFT 3,
– ESWBS 2352X – PROPULSION MOTOR, MAIN – SHAFT X,
– ESWBS 23600 – SELF-CONTAINED PROPULSION SYSTEMS,
– ESWBS 23700 – AUXILIARY PROPULSION DEVICES,
– ESWBS 23710 – PROPULSION DEVICES, AUXILIARY,
– ESWBS 23711 – PROPULSION DEVICES, AUXILIARY,
– ESWBS 23810 – SECONDARY PROPULSION,
– ESWBS 23811 – SECONDARY PROPULSION,
– ESWBS 23900 – EMERGENCY PROPULSION,
– ESWBS 23910 – EMERGENCY PROPULSION,
– ESWBS 23911 – EMERGENCY PROPULSION,
– ESWBS 2400 – MINE AND MINE COUNTERMEASURE WARFARE,
– ESWBS 24000 – TRANSMISSION AND PROPULSOR SYSTEMS,
– ESWBS 24100 – PROPULSION REDUCTION GEARS,
– ESWBS 24110 – PROPULSION REDUCTION GEARS,
– ESWBS 24111 – PROPULSION REDUCTION GEAR – SHAFT 1, STBD,
– ESWBS 24112 – PROPULSION REDUCTION GEAR – SHAFT 2, CENTERLINE,
– ESWBS 24113 – PROPULSION REDUCTION GEAR – SHAFT 3, PORT,
– ESWBS 24120 – PROPULSION REDUCTION GEARS-FOILBORNE,
– ESWBS 24121 – PROPULSION REDUCTION GEARS-FOILBORNE,
– ESWBS 24200 – PROPULSION CLUTCHES AND COUPLINGS,
– ESWBS 24210 – PROPULSION CLUTCHES AND COUPLINGS,
– ESWBS 24211 – PROPULSION CLUTCHES AND COUPLINGS – SHAFT 1,
– ESWBS 24212 – PROPULSION CLUTCHES AND COUPLINGS – SHAFT 2,
– ESWBS 24213 – PROPULSION CLUTCHES AND COUPLINGS – SHAFT 3,
– ESWBS 24214 – PROPULSION CLUTCHES AND COUPLINGS – SHAFT 4,
– ESWBS 24220 – PROPULSION COUPLING-FOILBORNE,
– ESWBS 24221 – PROPULSION COUPLING-FOILBORNE,
– ESWBS 24300 – PROPULSION SHAFTING,
– ESWBS 24310 – PROPULSION SHAFTING,
– ESWBS 24311 – PROPULSION SHAFTING – SHAFT 1,
– ESWBS 24312 – PROPULSION SHAFTING – SHAFT 2,
– ESWBS 24313 – PROPULSION SHAFTING – SHAFT 3,
– ESWBS 24314 – PROPULSION SHAFTING – SHAFT 4,
– ESWBS 24400 – PROPULSION SHAFT BEARINGS,
– ESWBS 24410 – PROPULSION SHAFT BEARINGS,
– ESWBS 24411 – PROPULSION SHAFT BEARING – SHAFT 1,
– ESWBS 24412 – PROPULSION SHAFT BEARING – SHAFT 2,
– ESWBS 24413 – PROPULSION SHAFT BEARING – SHAFT 3,
– ESWBS 24414 – PROPULSION SHAFT BEARING – SHAFT 4,
– ESWBS 24500 – PROPULSORS,
– ESWBS 24510 – PROPELLERS AND PROPULSORS,
– ESWBS 24511 – PROPELLERS AND PROPULSORS – SHAFT 1,
– ESWBS 24512 – PROPELLERS AND PROPULSORS – SHAFT 2,
– ESWBS 24513 – PROPELLERS AND PROPULSORS – SHAFT 3,
– ESWBS 24514 – PROPELLERS AND PROPULSORS – SHAFT 4,
– ESWBS 24600 – PROPULSOR SHROUDS AND DUCTS,
– ESWBS 24610 – PROPULSOR SHROUDS AND DUCTS,
– ESWBS 24611 – PROPULSOR SHROUDS AND DUCTS,
– ESWBS 24700 – WATER JET PROPULSORS,
– ESWBS 24710 – PROPULSORS, WATER JET – HULLBORNE,
– ESWBS 24711 – PROPULSORS, WATER JET – HULLBORNE – NO. 1,
– ESWBS 24712 – PROPULSORS, WATER JET – HULLBORNE – NO. 2,
– ESWBS 24713 – PROPULSORS, WATER JET – HULLBORNE – NO. 3,
– ESWBS 24714 – PROPULSORS, WATER JET – HULLBORNE – NO. 4,
– ESWBS 24720 – PROPULSORS, WATER JET-FOILBORNE,
– ESWBS 24721 – PROPULSORS, WATER JET-FOILBORNE,
– ESWBS 24800 – LIFT SYSTEM FANS AND DUCTING,
– ESWBS 24810 – LIFT SYSTEM FANS AND DUCTING,
– ESWBS 24811 – LIFT SYSTEM FANS AND DUCTING,
– ESWBS 2500 – INSHORE WARFARE,
– ESWBS 25000 – PROPULSION SUPPORT SYS. (EXCEPT FUEL AND LUBE OIL),
– ESWBS 25100 – COMBUSTION AIR SYSTEM,
– ESWBS 25110 – BLOWERS, FORCED DRAFT,
– ESWBS 2511X – BLOWERS, FORCED DRAFT – NO. X,
– ESWBS 25120 – BLOWERS, LIGHT OFF,
– ESWBS 25121 – BLOWERS, LIGHT OFF,
– ESWBS 25130 – INTAKES, COMBUSTION AIR, GAS TURBINE,
– ESWBS 2513X – INTAKES, COMBUSTION AIR, GAS TURBINE – NO. X,
– ESWBS 25140 – INTAKES, COMBUSTION AIR, DIESEL,
– ESWBS 2514X – INTAKES, COMBUSTION AIR, DIESEL – NO. X,
– ESWBS 25150 – INTAKES, COMBUSTION AIR, BOILER,
– ESWBS 2515X – INTAKES, COMBUSTION AIR, BOILER – NO. X,
– ESWBS 25200 – PROPULSION CONTROL SYSTEM,
– ESWBS 25210 – PROPULSION CONTROL SYSTEM, AUTOMATIC,
– ESWBS 25211 – PROPULSION CONTROL SYSTEM – MPCMS ECC MAIN CONSOLE,
– ESWBS 25212 – PROPULSION CONTROL SYSTEM – MPCMS PLC CONTROLLER,
– ESWBS 25213 – PROPULSION CONTROL SYSTEM – MPCMS SECONDARY CONSOLE,
– ESWBS 25214 – PROPULSION CONTROL SYSTEM – MPCMS REMOTE TERMINAL UNIT,
– ESWBS 25215 – PROPULSION CONTROL SYSTEM – PILOTHOUSE/BRIDGE,
– ESWBS 25216 – PROPULSION CONTROL SYSTEM -MPCMS VIDEO DISPLAY TERMINAL (VDT),
– ESWBS 25217 – PROPULSION CONTROL SYSTEM – MPCMS LOCAL CONTROL PANEL,
– ESWBS 25218 – PROPULSION CONTROL SYSTEM – PERSONNEL AND EQUIP. MODULE,
– ESWBS 25220 – PROPULSION CONTROL SYSTEM, AUTOMATIC-FOILBORNE,
– ESWBS 25221 – PROPULSION CONTROL SYSTEM, AUTOMATIC-FOILBORNE,
– ESWBS 25300 – MAIN STEAM PIPING SYSTEM,
– ESWBS 25310 – PIPING, MAIN STEAM,
– ESWBS 2531X – PIPING, MAIN STEAM-SHAFT X,
– ESWBS 25400 – CONDENSERS AND AIR EJECTORS,
– ESWBS 25410 – MAIN CONDENSERS AND AIR EJECTORS,
– ESWBS 2541X – MAIN CONDENSERS AND AIR EJECTORS – SHAFT X,
– ESWBS 25420 – CONDENSERS AND AIR EJECTORS, AUXILIARY,
– ESWBS 2542X – CONDENSERS AND AIR EJECTORS, AUXILIARY – NO. X,
– ESWBS 25430 – CONDENSERS AND FANS, AUXILIARY GLAND EXHAUST,
– ESWBS 2543X – CONDENSERS AND FANS, AUXILIARY GLAND EXHAUST – SHAFT X,
– ESWBS 25440 – PIPING/ACCESSORIES, MAIN/AUX CONDENSERS AND AIR EJECTORS,
– ESWBS 2544X – PIPING, MAIN/AUXILIARY CONDENSERS AND AIR EJECTORS-SHAFT X,
– ESWBS 25450 – CONDENSERS AND AIR EJECTORS, CPTG,
– ESWBS 2545X – CONDENSERS AND AIR EJECTORS, CPTG – NO. X,
– ESWBS 25500 – FEED AND CONDENSATE SYSTEM,
– ESWBS 25510 – PIPING AND ACCESSORIES, MAIN FEEDWATER,
– ESWBS 2551X – PIPING, MAIN FEEDWATER – SHAFT X,
– ESWBS 25520 – PUMPS, MAIN FEED,
– ESWBS 2552X – PUMPS, MAIN FEED – SHAFT X,
– ESWBS 25530 – PUMPS, MAIN FEED BOOSTER, EMERGENCY FEED,
– ESWBS 2553X – PUMPS, EMERGENCY FEED – APPLICATION X,
– ESWBS 25540 – PIPING AND ACCESSORIES, MAIN/AUXILIARY CONDENSATE,
– ESWBS 2554X – PIPING AND ACCESSORIES, MAIN/AUXILIARY CONDENSATE-SHAFT X,
– ESWBS 25550 – PUMPS, MAIN CONDENSATE,
– ESWBS 2555X – PUMPS, MAIN CONDENSATE – SHAFT X,
– ESWBS 25560 – PUMPS, AUXILIARY CONDENSATE,
– ESWBS 2556X – PUMPS, AUXILIARY CONDENSATE – NO. X,
– ESWBS 25570 – TANKS, DEAERATING FEED,
– ESWBS 2557X – TANK, DEAERATING FEED – SHAFT X,
– ESWBS 25580 – PUMPS, AUXILIARY CONDS., COOLANT PUMP, TURBINE GENERATOR,
– ESWBS 2558X – PUMP, AUX. CONDS., COOLANT PUMP, TURBINE GENERATOR-NO. X,
– ESWBS 25600 – CIRCULATING AND COOLING SEA WATER SYSTEM,
– ESWBS 25610 – PIPING, CIRCULATING AND COOLING SEA WATER,
– ESWBS 25611 – PIPING, CIRCULATING AND COOLING SEA WATER – SHAFT 1,
– ESWBS 25612 – PIPING, CIRCULATING AND COOLING SEA WATER – SHAFT 2,
– ESWBS 25613 – PIPING, CIRCULATING AND COOLING SEA WATER – SHAFT 3,
– ESWBS 25620 – PUMPS, MAIN CIRCULATING,
– ESWBS 25621 – PUMPS, MAIN CIRCULATING – SHAFT 1,
– ESWBS 25622 – PUMPS, MAIN CIRCULATING – SHAFT 2,
– ESWBS 25623 – PUMPS, MAIN CIRCULATING – SHAFT 3,
– ESWBS 25630 – PUMPS, AUXILIARY CIRCULATING,
– ESWBS 25631 – PUMPS, AUXILIARY CIRCULATING – NO 1,
– ESWBS 25632 – PUMPS, AUXILIARY CIRCULATING – NO 2,
– ESWBS 25633 – PUMPS, AUXILIARY CIRCULATING – NO 3,
– ESWBS 25640 – PUMPS, AUX. CIRCULATING, COOLANT PUMP, TURBINE GENERATOR,
– ESWBS 2564X – PUMP, AUX. CIRCULATING, COOLANT PUMP, TURBINE GEN.- NO. X,
– ESWBS 25650 – PIPING, FIREMAIN SUPPLIED SEA WATER COOLING SYSTEM,
– ESWBS 25651 – PIPING, FIREMAIN SUPPLIED SEA WATER COOLING SYSTEM,
– ESWBS 25660 – PIPING, CENTRALIZED CIRCULATING AND COOLING SEA WATER,
– ESWBS 25661 – PIPING, CTLIZED CRCLTING AND COOLING SW-SHAFT OR BRANCH 1,
– ESWBS 25662 – PIPING, CTLIZED CRCLTING AND COOLING SW-SHAFT OR BRANCH 2,
– ESWBS 25663 – PIPING, CTLIZED CRCLTING AND COOLING SW-SHAFT OR BRANCH 3,
– ESWBS 25670 – PUMPS, CENTRALIZED SEA WATER COOLING SYSTEM,
– ESWBS 25671 – PUMP ASSEMBLY, CENTRALIZED SEA WATER COOLING – NO. 1,
– ESWBS 25672 – PUMP ASSEMBLY, CENTRALIZED SEA WATER COOLING – NO. 2,
– ESWBS 25673 – PUMP ASSEMBLY, CENTRALIZED SEA WATER COOLING – NO. 3,
– ESWBS 25700 – RESERVE FEED AND TRANSFER SYSTEM,
– ESWBS 25710 – PIPING AND ACCESSORIES, RESERVE FEED AND TRANSFER,
– ESWBS 2571X – PIPING/ACCESSORIES, RESERVE FEED AND TRANSFER – SHAFT X,
– ESWBS 25720 – PUMPS, RESERVE FEED AND TRANSFER SYSTEM,
– ESWBS 2572X – PUMP, RESERVE FEED AND TRANSFER SYSTEM – SHAFT X,
– ESWBS 25800 – HP STEAM DRAIN SYSTEM,
– ESWBS 25810 – DRAIN SYSTEM, HIGH PRESSURE STEAM,
– ESWBS 2581X – DRAIN SYSTEM, HIGH PRESSURE STEAM – SHAFT X,
– ESWBS 25900 – UPTAKES (INNER CASING),
– ESWBS 25910 – EXHAUST UPTAKES AND BAFFLES, INNER CASING,
– ESWBS 25911 – EXHAUST UPTAKES AND BAFFLES, INNER CASING – APPLICATION 1,
– ESWBS 25912 – EXHAUST UPTAKES AND BAFFLES, INNER CASING – APPLICATION 2,
– ESWBS 25913 – EXHAUST UPTAKES AND BAFFLES, INNER CASING – APPLICATION 3,
– ESWBS 25914 – EXHAUST UPTAKES AND BAFFLES, INNER CASING – APPLICATION 4,
– ESWBS 26000 – PROPULSION SUPPORT SYSTEMS (FUEL AND LUBE OIL),
– ESWBS 26100 – FUEL SERVICE SYSTEM,
– ESWBS 26110 – PIPING AND MISCELLANEOUS, FUEL SERVICE,
– ESWBS 26111 – PIPING AND MISC., FUEL SERVICE – SYSTEM OR SPACE 1,
– ESWBS 26112 – PIPING AND MISC., FUEL SERVICE – SYSTEM OR SPACE 2,
– ESWBS 26113 – PIPING AND MISC., FUEL SERVICE – SYSTEM OR SPACE 3,
– ESWBS 26114 – PIPING AND MISC., FUEL SERVICE – SYSTEM OR SPACE 4,
– ESWBS 26120 – PUMPS, FUEL SERVICE,
– ESWBS 26121 – PUMPS, FUEL SERVICE – SYSTEM 1,
– ESWBS 26122 – PUMPS, FUEL SERVICE – SYSTEM 2,
– ESWBS 26123 – PUMPS, FUEL SERVICE – SYSTEM 3,
– ESWBS 26124 – PUMPS, FUEL SERVICE – SYSTEM 4,
– ESWBS 26130 – PURIFIERS, FUEL SERVICE (DELETED – SEE 54122 AND 54222),
– ESWBS 26131 – PURIFIERS, FUEL SERVICE (DELETED – SEE 54122 AND 54222),
– ESWBS 26200 – MAIN PROPULSION LUBE OIL SYSTEM,
– ESWBS 26210 – PIPING AND ACCESSORIES, MAIN LUBE OIL,
– ESWBS 26211 – PIPING AND ACCESSORIES, MAIN LUBE OIL – SYSTEM 1,
– ESWBS 26212 – PIPING AND ACCESSORIES, MAIN LUBE OIL – SYSTEM 2,
– ESWBS 26213 – PIPING AND ACCESSORIES, MAIN LUBE OIL – SYSTEM 3,
– ESWBS 26214 – PIPING AND ACCESSORIES, MAIN LUBE OIL – SYSTEM 4,
– ESWBS 26220 – TANKS, MAIN LUBE OIL, NON-STRUCTURAL,
– ESWBS 26221 – TANKS, MAIN LUBE OIL, NON-STRUCTURAL – SYSTEM 1,
– ESWBS 26222 – TANKS, MAIN LUBE OIL, NON-STRUCTURAL – SYSTEM 2,
– ESWBS 26223 – TANKS, MAIN LUBE OIL, NON-STRUCTURAL – SYSTEM 3,
– ESWBS 26230 – PUMPS, MAIN LUBE OIL ATTACHED,
– ESWBS 26231 – PUMPS, MAIN LUBE OIL ATTACHED – SYSTEM 1,
– ESWBS 26232 – PUMPS, MAIN LUBE OIL ATTACHED – SYSTEM 2,
– ESWBS 26233 – PUMPS, MAIN LUBE OIL ATTACHED – SYSTEM 3,
– ESWBS 26234 – PUMPS, MAIN LUBE OIL ATTACHED – SYSTEM 4,
– ESWBS 26235 – PUMPS, MAIN LUBE OIL ATTACHED – SYSTEM 5,
– ESWBS 26236 – PUMPS, MAIN LUBE OIL ATTACHED – SYSTEM 6,
– ESWBS 26240 – PUMPS, MAIN LUBE OIL, NON-ATTACHED,
– ESWBS 26241 – PUMPS, MAIN LUBE OIL, NON-ATTACHED – SYSTEM 1,
– ESWBS 26242 – PUMPS, MAIN LUBE OIL, NON-ATTACHED – SYSTEM 2,
– ESWBS 26243 – PUMPS, MAIN LUBE OIL, NON-ATTACHED – SYSTEM 3,
– ESWBS 26244 – PUMPS, MAIN LUBE OIL, NON-ATTACHED – SYSTEM 4,
– ESWBS 26245 – PUMPS, MAIN LUBE OIL, NON-ATTACHED – SYSTEM 5,
– ESWBS 26246 – PUMPS, MAIN LUBE OIL, NON-ATTACHED – SYSTEM 6,
– ESWBS 26400 – LUBE OIL FILL, TRANSFER, AND PURIFICATION,
– ESWBS 26410 – LUBE OIL FILL, TRANSFER AND PRFCN. PIPING AND HAND PUMPS,
– ESWBS 26411 – LUBE OIL FILL, TRANSFER AND PRFCN. PIPING AND HAND PUMPS,
– ESWBS 26420 – PUMPS, LUBE OIL FILL AND TRANSFER,
– ESWBS 26421 – PUMPS, LUBE OIL FILL AND TRANSFER,
– ESWBS 26426 – PUMPS, MAIN LUBE OIL, NON-ATTACHED – SYSTEM 6,
– ESWBS 26430 – PURIFIERS, LUBE OIL,
– ESWBS 26431 – PURIFIERS, LUBE OIL,
– ESWBS 29000 – SPECIAL PURPOSE SYSTEMS,
– ESWBS 29800 – PROPULSION PLANT OPERATING FLUIDS,
– ESWBS 29900 – PROPULSION PLANT REPAIR PARTS AND SPECIAL TOOLS,
– ESWBS 29910 – PROPULSION PLANT MISCELLANEOUS PARTS,
– ESWBS 29911 – PROPULSION PLANT MISCELLANEOUS PARTS,
– ESWBS 29920 – PROPULSION PLANT SPECIAL TOOLS,
– ESWBS 29921 – PROPULSION PLANT SPECIAL TOOLS,
– ESWBS 29921 – ,
– ESWBS 3000 – TACTICAL AND STRATEGIC OPERATION SUPPORT CAPABILITIES,
– ESWBS 30000 – ELECTRIC PLANT, GENERAL,
– ESWBS 30100 – GENERAL ARRANGEMENT-ELECTRICAL DRAWINGS,
– ESWBS 30200 – MOTORS AND ASSOCIATED EQUIPMENT,
– ESWBS 30300 – PROTECTIVE DEVICES,
– ESWBS 30400 – ELECTRIC CABLES,
– ESWBS 30500 – ELECTRICAL DESIGNATING AND MARKING,
– ESWBS 3100 – COMMAND/CONTROL/COMMUNICATIONS,
– ESWBS 31000 – ELECTRIC POWER GENERATION,
– ESWBS 31100 – SHIP SERVICE POWER GENERATION,
– ESWBS 31110 – GENERATOR SETS, SHIP SERVICE STEAM TURBINE,
– ESWBS 3111X – GENERATOR SET, SHIP SERVICE STEAM TURBINE – NO. X,
– ESWBS 31120 – GENERATOR SETS, SHIP SERVICE DIESEL,
– ESWBS 31121 – GENERATOR SET, SHIP SERVICE DIESEL- NO. 1,
– ESWBS 31122 – GENERATOR SET, SHIP SERVICE DIESEL – NO. 2,
– ESWBS 31123 – GENERATOR SET, SHIP SERVICE DIESEL – NO. 3,
– ESWBS 31130 – GENERATOR SETS, SHIP SERVICE GAS TURBINE,
– ESWBS 3113X – GENERATOR SET, SHIP SERVICE GAS TURBINE – NO. X,
– ESWBS 31140 – GENERATOR SETS, SPECIAL FREQUENCY TURBINE,
– ESWBS 3114X – GENERATOR SET, SPECIAL FREQUENCY TURBINE – GEN SET X,
– ESWBS 31150 – GENERATOR SETS, COOLANT PUMP (NUCLEAR),
– ESWBS 3115X – GENERATOR SET, COOLANT PUMP (NUCLEAR) – GEN SET NO. X,
– ESWBS 31200 – EMERGENCY GENERATORS,
– ESWBS 31210 – GENERATOR SETS, EMERGENCY DIESEL,
– ESWBS 31211 – GENERATOR SET, EMERGENCY DIESEL – NO. 1,
– ESWBS 31212 – GENERATOR SET, EMERGENCY DIESEL – NO. 2,
– ESWBS 31220 – GENERATOR SETS, EMERGENCY GAS TURBINE,
– ESWBS 3122X – GENERATOR SET, EMERGENCY GAS TURBINE – NO. X,
– ESWBS 31300 – BATTERIES AND SERVICE FACILITIES,
– ESWBS 31310 – BATTERIES AND SERVICE FACILITIES,
– ESWBS 31311 – BATTERIES AND SERVICE FACILITIES,
– ESWBS 31400 – POWER CONVERSION EQUIPMENT,
– ESWBS 31410 – MOTOR GENERATORS, 60 HZ,
– ESWBS 31411 – MOTOR GENERATORS, 60 HZ,
– ESWBS 31420 – MOTOR GENERATORS,400 HZ,
– ESWBS 31421 – MOTOR GENERATORS,400 HZ,
– ESWBS 31430 – POWER CONVERSION, SPECIAL PURPOSE COMPONENTS,
– ESWBS 31431 – POWER CONVERSION, SPECIAL PURPOSE COMPONENTS,
– ESWBS 31440 – POWER SUPPLIES, DC,
– ESWBS 31441 – POWER SUPPLY, DC,
– ESWBS 3200 – SURVEILLANCE/RECONNAISSANCE/INTELLIGENCE,
– ESWBS 32000 – POWER DISTRIBUTION SYSTEMS,
– ESWBS 32100 – SHIP SERVICE POWER CABLE,
– ESWBS 32110 – SHIP SERVICE POWER CABLE,
– ESWBS 32111 – SHIP SERVICE POWER CABLE,
– ESWBS 32120 – POWER DISTRIBUTION SYSTEMS,
– ESWBS 32121 – DC POWER DISTRIBUTION SYSTEM,
– ESWBS 32122 – 400 HZ POWER DISTRIBUTION SYSTEM,
– ESWBS 32123 – 60 HZ POWER DISTRIBUTION SYSTEM,
– ESWBS 32125 – AIRCRAFT ELECTRICAL SERVICING SYSTEM (AESS) – 400 HZ,
– ESWBS 32200 – EMERGENCY POWER CABLE SYSTEM,
– ESWBS 32210 – EMERGENCY POWER CABLE SYSTEM,
– ESWBS 32211 – EMERGENCY POWER CABLE SYSTEM,
– ESWBS 32300 – CASUALTY POWER CABLE SYSTEM,
– ESWBS 32310 – CASUALTY POWER CABLE SYSTEM,
– ESWBS 32311 – CASUALTY POWER CABLE SYSTEM,
– ESWBS 32400 – SWITCHGEAR AND PANELS,
– ESWBS 32410 – SWITCHGEAR AND PANELS, 60 HZ POWER,
– ESWBS 32411 – SHIP SERVICE SWITCHBOARD,
– ESWBS 32412 – EMERGENCY SWITCHGEAR,
– ESWBS 32414 – TEST SWITCHBOARD,
– ESWBS 32420 – SWITCHGEAR AND PANELS, 400 HZ POWER,
– ESWBS 3242X – SWITCHGEAR AND PANELS, 400 HZ POWER – SWBD. NO. X,
– ESWBS 32430 – SWITCHGEAR AND PANELS, DC POWER,
– ESWBS 3243X – SWITCHGEAR AND PANELS, DC POWER – SWBD NO. X,
– ESWBS 32500 – ARC FAULT DETECTOR (AFD) SYSTEMS,
– ESWBS 32510 – ARC FAULT DETECTOR (AFD) SYSTEMS,
– ESWBS 32511 – AFD SYSTEM, ENGINEERING SPACES,
– ESWBS 32512 – AFD SYSTEM, NON-ENGINEERING SPACES,
– ESWBS 3300 – ELECTRONIC WARFARE AND NUC/BIO/CHEMICAL DEFENSE,
– ESWBS 33000 – LIGHTING SYSTEM,
– ESWBS 33100 – LIGHTING DISTRIBUTION,
– ESWBS 33110 – LIGHTING DISTRIBUTION,
– ESWBS 33111 – LIGHTING DISTRIBUTION,
– ESWBS 33200 – LIGHTING FIXTURES,
– ESWBS 33210 – LIGHTING FIXTURES,
– ESWBS 33211 – LIGHTING FIXTURES,
– ESWBS 3400 – LOGISTICS/SEALIFT,
– ESWBS 34000 – POWER GENERATION SUPPORT SYSTEMS,
– ESWBS 34100 – SSTG LUBE OIL,
– ESWBS 34110 – LUBE OIL SYSTEMS, SHIP SERVICE TURBINE GENERATOR,
– ESWBS 3411X – LUBE OIL SYSTEM, SHIP SERVICE TURBINE GENERATOR – NO. X,
– ESWBS 34120 – LUBE OIL SYSTEMS, COOLANT PUMP TURBINE GENERATOR,
– ESWBS 3412X – LUBE OIL SYSTEM, COOLANT TURBINE GENERATOR – NO. X,
– ESWBS 34200 – DIESEL SUPPORT SYSTEMS,
– ESWBS 34210 – GENERATOR SUPPORT SYSTEMS, SHIP SERVICE DIESEL,
– ESWBS 3421X – GENERATOR SUPPORT SYSTEM, SHIP SERVICE DIESEL – NO. X,
– ESWBS 34220 – GENERATOR SUPPORT SYSTEMS, EMERGENCY DIESEL,
– ESWBS 3422X – GENERATOR SUPPORT SYSTEM, EMERGENCY DIESEL – NO. X,
– ESWBS 34300 – TURBINE SUPPORT SYSTEMS,
– ESWBS 34310 – GENERATOR SUPPORT SYSTEMS, SHIP SERVICE GAS TURBINE,
– ESWBS 3431X – GENERATOR SUPPORT SYSTEM, SHIP SERVICE GAS TURBINE – NO. X,
– ESWBS 34320 – GENERATOR SUPPORT SYSTEMS, EMERGENCY GAS TURBINE,
– ESWBS 3432X – GENERATOR SUPPORT SYSTEM, EMERGENCY GAS TURBINE – NO. X,
– ESWBS 34330 – GENERATOR SUPPORT SYSTEMS, SPECIAL FREQUENCY TURBINE,
– ESWBS 3433X – GENERATOR SUPPORT SYS., SPECIAL FREQUENCY TURBINE-SHAFT X,
– ESWBS 3500 – OTHER SUPPORT,
– ESWBS 39000 – SPECIAL PURPOSE SYSTEMS,
– ESWBS 39800 – ELECTRIC PLANT OPERATING FLUIDS,
– ESWBS 39900 – ELECTRIC PLANT REPAIR PARTS AND SPECIAL TOOLS,
– ESWBS 39910 – ELECTRIC PLANT MISCELLANEOUS PARTS,
– ESWBS 39911 – ELECTRIC PLANT MISCELLANEOUS PARTS,
– ESWBS 39920 – ELECTRIC PLANT SPECIAL TOOLS,
– ESWBS 39921 – ELECTRIC PLANT SPECIAL TOOLS,
– ESWBS 39921 – ,
– ESWBS 4000 – SHIP SYSTEM MANAGEMENT,
– ESWBS 40000 – COMMAND AND SURVEILLANCE, GENERAL,
– ESWBS 40100 – GENERAL ARRANGEMENT – COMMAND AND SURVEILLANCE,
– ESWBS 40200 – SECURITY REQUIREMENTS,
– ESWBS 40300 – PERSONNEL SAFETY,
– ESWBS 40400 – RADIO FREQUENCY TRANSMISSION LINES,
– ESWBS 40500 – ANTENNA REQUIREMENTS,
– ESWBS 40600 – GROUNDING AND BONDING,
– ESWBS 40700 – ELECTROMAGNETIC INTERFERENCE REDUCTION (EMI),
– ESWBS 40710 – SURVEY, ELECTROMAGNETIC INTERFERENCE,
– ESWBS 40711 – SURVEY, ELECTROMAGNETIC INTERFERENCE,
– ESWBS 40800 – SYSTEM TEST REQUIREMENTS,
– ESWBS 40900 – COMBAT SYSTEM GENERAL REQUIREMENTS,
– ESWBS 4100 – PROJECT MANAGEMENT,
– ESWBS 41000 – COMMAND AND CONTROL SYSTEMS,
– ESWBS 41010 – TESTING, COMMAND AND CONTROL INTRA-SYSTEM,
– ESWBS 41011 – TESTING, COMMAND AND CONTROL INTRA-SYSTEM,
– ESWBS 41012 – CONTROL & MONITOR SYSTEMS,
– ESWBS 4110 – CONFIGURATION MANAGEMENT,
– ESWBS 41100 – DATA DISPLAY GROUP,
– ESWBS 41110 – TACTICAL DATA DISPLAY,
– ESWBS 41111 – TACTICAL DATA DISPLAY,
– ESWBS 41120 – SHIP DATA DISPLAY,
– ESWBS 41121 – SHIP DATA DISPLAY,
– ESWBS 41200 – DATA PROCESSING GROUP,
– ESWBS 41210 – TACTICAL DATA PROCESSING,
– ESWBS 41211 – TACTICAL DATA PROCESSING,
– ESWBS 41300 – DIGITAL DATA SWITCHBOARDS (DELETED – SEE 41411),
– ESWBS 41311 – DIGITAL DATA SWITCHBOARDS,
– ESWBS 41400 – INTERFACE EQUIPMENT,
– ESWBS 41410 – TACTICAL DATA SYSTEM SWITCHBOARD AND INTERFACING EQUIPMENT,
– ESWBS 41411 – TACTICAL DATA SYSTEM SWITCHBOARD AND INTERFACING EQUIPMENT,
– ESWBS 41500 – DIGITAL DATA COMMUNICATIONS,
– ESWBS 41510 – TACTICAL DATA SYSTEM COMMUNICATIONS,
– ESWBS 41511 – TACTICAL DATA SYSTEM COMMUNICATIONS,
– ESWBS 41700 – COMMAND AND CONTROL ANALOG SWITCHBOARDS (DEL – SEE 41411),
– ESWBS 41811 – COMMAND & CONTROL DIGITAL MONITORING,
– ESWBS 4200 – GENERAL ADMINISTRATIVE REQUIREMENTS,
– ESWBS 42000 – NAVIGATION SYSTEMS,
– ESWBS 42010 – TESTING, NAVIGATION SYSTEM INTRA-SYSTEM,
– ESWBS 42011 – TESTING, NAVIGATION SYSTEM INTRA-SYSTEM,
– ESWBS 42100 – NON-ELECTRICAL/NON-ELECTRONIC NAVIGATION AIDS,
– ESWBS 42110 – NAVIGATION AIDS, NON-ELECTRICAL/NON-ELECTRONIC,
– ESWBS 42111 – NAVIGATION AIDS, NON-ELECTRICAL/NON-ELECTRONIC,
– ESWBS 42200 – ELECTRICAL NAVIGATION AIDS (INCL NAVIG. LIGHTS),
– ESWBS 42210 – NAVIGATION AIDS, ELECTRICAL,
– ESWBS 42211 – NAVIGATION AIDS, ELECTRICAL,
– ESWBS 42221 – NAVIGATION AIDS, LIGHTHOUSE EQUIPMENT,
– ESWBS 42300 – ELECTRONIC NAVIGATION SYSTEMS,
– ESWBS 42310 – ELECTRONIC NAVIGATION SYSTEMS, RADIO,
– ESWBS 42311 – LORAN,
– ESWBS 42312 – DIRECTION FINDER RADIO SET,
– ESWBS 42313 – TACAN BEACON,
– ESWBS 42314 – NAVIGATION SYSTEM, OMEGA,
– ESWBS 42315 – SATELLITE NAVIGATION RADIO SET,
– ESWBS 42316 – BEACON, RADIO,
– ESWBS 42320 – NAVIGATION, HI SPEED COLLISION AVOIDANCE SYSTEM,
– ESWBS 42321 – NAVIGATION, HI SPEED COLLISION AVOIDANCE SYSTEM,
– ESWBS 42400 – ELECTRONIC NAVIGATION SYSTEMS, ACOUSTICAL,
– ESWBS 42410 – DEPTH SOUNDING EQUIPMENT,
– ESWBS 42411 – DEPTH SOUNDING EQUIPMENT,
– ESWBS 42422 – NAVIGATION SYSTEMS, ACCOUSTICAL AIDS,
– ESWBS 42600 – ELECTRICAL NAVIGATION SYSTEMS,
– ESWBS 42610 – GYROCOMPASS SYSTEM,
– ESWBS 42611 – GYROCOMPASS SYSTEM, MAGNETIC,
– ESWBS 42612 – GYROCOMPASS SYSTEM, ELECTRONIC,
– ESWBS 42620 – NAVIGATION SYSTEM, ELECTRICAL (LESS GYRO AND DEPTH DET),
– ESWBS 42621 – OSMOS,
– ESWBS 42622 – UNDERWATER LOG SYSTEM,
– ESWBS 42623 – DEAD RECKONING SYSTEM,
– ESWBS 42624 – PITCH AND ROLL INDICATION SYSTEM,
– ESWBS 42700 – INERTIAL NAVIGATION SYSTEMS,
– ESWBS 42710 – INERTIAL NAVIGATION SYSTEMS,
– ESWBS 42711 – INERTIAL NAVIGATION SYSTEMS,
– ESWBS 42720 – NAVIGATION ALIGNMENT SYSTEM, AIRCRAFT INERTIAL,
– ESWBS 42721 – NAVIGATION ALIGNMENT SYSTEM, AIRCRAFT INERTIAL,
– ESWBS 42800 – NAVIGATION CONTROL MONITORING,
– ESWBS 42810 – NAVIGATION CONTROL, MONITORING AND SUPPORT,
– ESWBS 42811 – NAVIGATION CONTROL, MONITORING AND SUPPORT,
– ESWBS 4300 – LIFE CYCLE COSTING,
– ESWBS 43000 – INTERIOR COMMUNICATIONS,
– ESWBS 43100 – SWITCHBOARDS FOR INTERIOR COMMUNICATION SYSTEMS,
– ESWBS 43110 – SWITCHBOARDS, IC,
– ESWBS 43111 – SWITCHBOARDS, IC,
– ESWBS 43120 – SHIPBOARD DATA MULTIPLEX SYSTEM,
– ESWBS 43121 – SHIPBOARD DATA MULTIPLEX SYSTEM,
– ESWBS 43200 – TELEPHONE SYSTEMS,
– ESWBS 43210 – TELEPHONE SYSTEMS,
– ESWBS 43211 – DIAL TELEPHONE SYSTEMS,
– ESWBS 43212 – SOUND POWERED TELEPHONE SYSTEMS,
– ESWBS 43213 – CALL CIRCUIT SYSTEMS,
– ESWBS 43214 – INTEGRATED VOICE COMMUNICATION SYSTEM,
– ESWBS 43300 – ANNOUNCING SYSTEMS,
– ESWBS 43310 – ANNOUNCING SYSTEMS,
– ESWBS 43311 – ANNOUNCING SYSTEMS,
– ESWBS 43400 – ENTERTAINMENT AND TRAINING SYSTEMS,
– ESWBS 43410 – AUDIO VISUAL EQUIPMENT, TRAINING AND ENTERTAINMENT,
– ESWBS 43411 – AUDIO VISUAL EQUIPMENT, TRAINING AND ENTERTAINMENT,
– ESWBS 43500 – VOICE TUBES AND MESSAGE PASSING SYSTEMS,
– ESWBS 43510 – VOICE TUBES AND MESSAGE PASSING SYSTEMS,
– ESWBS 43511 – VOICE TUBES,
– ESWBS 43512 – MESSAGE PASSING SYSTEMS,
– ESWBS 43610 – ALARM, SAFETY AND WARNING SYSTEMS,
– ESWBS 43611 – ALARM, SAFETY AND WARNING SYSTEMS,
– ESWBS 43612 – ALARM, SAFETY, AND WARNING SYSTEMS,
– ESWBS 43700 – INDICATING, ORDER, AND METERING SYSTEMS,
– ESWBS 43710 – INDICATING, ORDER, AND METERING CIRCUITS,
– ESWBS 43711 – INDICATING, ORDER, AND METERING CIRCUITS,
– ESWBS 43720 – TANK LEVEL INDICATING SYSTEMS,
– ESWBS 43721 – TANK LEVEL INDICATING SYSTEMS,
– ESWBS 43730 – WIND INDICATING SYSTEMS,
– ESWBS 43731 – WIND INDICATING SYSTEMS,
– ESWBS 43800 – CONSOLIDATED CONTROL AND DISPLAY SYSTEMS,
– ESWBS 43810 – INTEGRATED CONTROL SYSTEMS,
– ESWBS 43811 – INTEGRATED CONTROL SYSTEM,
– ESWBS 43900 – RECORDING AND TELEVISION SYSTEMS,
– ESWBS 43910 – TELEVISION, CLOSED CIRCUIT,
– ESWBS 43911 – TELEVISION, CLOSED CIRCUIT,
– ESWBS 43920 – AUDIO RECORDING SYSTEMS,
– ESWBS 43921 – AUDIO RECORDING SYSTEMS,
– ESWBS 4400 – SHIP OPERATION,
– ESWBS 44000 – EXTERIOR COMMUNICATIONS,
– ESWBS 44010 – TESTING, INTEGRATED RADIO SYSTEMS,
– ESWBS 44011 – TESTING, INTEGRATED RADIO SYSTEMS (DELETED – SEE 86781),
– ESWBS 44100 – RADIO SYSTEMS,
– ESWBS 44110 – COMMUNICATION ANTENNA SYSTEMS,
– ESWBS 44111 – COMMUNICATION ANTENNA SYSTEMS,
– ESWBS 44120 – ANTENNA MULTICOUPLERS-TUNERS,
– ESWBS 44121 – ANTENNA MULTICOUPLERS-TUNERS,
– ESWBS 44130 – COMMUNICATION TRANSMITTERS,
– ESWBS 44131 – COMMUNICATION TRANSMITTERS,
– ESWBS 44140 – COMMUNICATION RECEIVERS,
– ESWBS 44141 – COMMUNICATION RECEIVERS,
– ESWBS 44150 – COMMUNICATION TRANSCEIVERS,
– ESWBS 44151 – COMMUNICATION TRANSCEIVERS,
– ESWBS 44160 – COMMUNICATION DEVICES, REMOTE & MISCELLANEOUS,
– ESWBS 44161 – COMMUNICATION DEVICES, REMOTE,
– ESWBS 44162 – INTERCONNECTING FACILITIES,
– ESWBS 44163 – TERMINAL FACILITIES,
– ESWBS 44164 – COMMUNICATION DEVICES, MISCELLANEOUS,
– ESWBS 44170 – COMMUNICATION SYSTEMS, SATELLITE,
– ESWBS 44171 – COMMUNICATION SYSTEMS, SATELLITE,
– ESWBS 44180 – CONTROL SYSTEMS, QUALITY MONITORING,
– ESWBS 44181 – CONTROL SYSTEMS, QUALITY MONITORING,
– ESWBS 44190 – MESSAGE PROCESSING DISTRIBUTION SYSTEMS (MPDS),
– ESWBS 44191 – NAVY MODULAR AUTOMATED COMMUNICATIONS SYSTEM (NAVMACS),
– ESWBS 44200 – UNDERWATER SYSTEMS,
– ESWBS 44210 – COMMUNICATION SYSTEM, UNDERWATER,
– ESWBS 44211 – COMMUNICATION SYSTEM, UNDERWATER,
– ESWBS 44300 – VISUAL AND AUDIBLE COMMUNICATION SYSTEMS,
– ESWBS 44310 – COMMUNICATION SYSTEMS, VISUAL AND AUDIBLE,
– ESWBS 44311 – COMMUNICATION SYSTEMS, VISUAL,
– ESWBS 44312 – COMMUNICATION SYSTEMS, AUDIBLE,
– ESWBS 44400 – TELEMETRY SYSTEMS,
– ESWBS 44500 – TELETYPE AND FACSIMILE SYSTEMS,
– ESWBS 44510 – TELETYPE AND FACSIMILE SYSTEMS,
– ESWBS 44511 – TELETYPE SYSTEMS,
– ESWBS 44512 – FACSIMILE SYSTEMS,
– ESWBS 44600 – SECURITY EQUIPMENT SYSTEMS,
– ESWBS 44610 – SECURITY EQUIPMENT,
– ESWBS 44611 – IFF SECURITY EQUIPMENT,
– ESWBS 44612 – LAMPS SECURITY EQUIPMENT,
– ESWBS 44613 – CRYPTO EQUIPMENT (DATA),
– ESWBS 44614 – CRYPTO EQUIPMENT (VOICE),
– ESWBS 44615 – MISCELLANEOUS SECURITY EQUIPMENT,
– ESWBS 44620 – TEMPEST INSPECTION AND DISCREPANCY RESOLUTION,
– ESWBS 44621 – TEMPEST INSPECTION AND DISCREPANCY RESOLUTION,
– ESWBS 4500 – CARE OF SHIP DURING CONSTRUCTION,
– ESWBS 45000 – SURVEILLANCE SYSTEMS, SURFACE AND AIR,
– ESWBS 45010 – RADAR DISTRIBUTION SYSTEMS,
– ESWBS 45011 – RADAR DISTRIBUTION SYSTEMS,
– ESWBS 45100 – SURFACE SURVEILLANCE RADAR SYSTEMS,
– ESWBS 45112 – RADAR SURFACE,
– ESWBS 45164 – RADAR, SURFACE SEARCH 64 SERIES,
– ESWBS 45169 – SURFACE SEARCH RADAR,
– ESWBS 451XY – RADAR, SURFACE SEARCH – XY SERIES,
– ESWBS 45200 – 2D AIR RADAR SYSTEMS,
– ESWBS 45240 – RADAR, AIR SEARCH 40 SERIES,
– ESWBS 452XY – RADAR, AIR SEARCH (2D) – XY SERIES,
– ESWBS 45300 – 3D AIR RADAR SYSTEMS,
– ESWBS 453XY – RADAR, HEIGHT FINDING (3D) – XY SERIES,
– ESWBS 45400 – AIRCRAFT CONTROL RADAR SYSTEMS,
– ESWBS 454XY – RADAR, AIRCRAFT CONTROL APPROACH – SERIES XY,
– ESWBS 45500 – IDENTIFICATION SYSTEMS,
– ESWBS 45510 – IDENTIFICATION SYSTEMS (IFF),
– ESWBS 45511 – IDENTIFICATION SYSTEMS (IFF),
– ESWBS 45600 – MULTI-FUNCTION RADAR SYSTEMS,
– ESWBS 456XY – RADAR, MULTIPLE MODE – XY SERIES,
– ESWBS 45700 – INFRARED SURVEILLANCE AND TRACKING SYSTEMS,
– ESWBS 45710 – INFRARED SURVEILLANCE AND TRACKING SYSTEMS,
– ESWBS 45711 – INFRARED SURVEILLANCE AND TRACKING SYSTEMS,
– ESWBS 45800 – AUTOMATIC DETECTION AND TRACKING SYSTEMS,
– ESWBS 45810 – AUTOMATIC DETECTION AND TRACKING SYSTEMS,
– ESWBS 45811 – AUTOMATIC DETECTION AND TRACKING SYSTEMS,
– ESWBS 45900 – SPACE VEHICLE ELECTRONIC TRACKING,
– ESWBS 46000 – SURVEILLANCE SYSTEMS (UNDERWATER),
– ESWBS 46100 – ACTIVE SURVEILLANCE SONAR,
– ESWBS 461XY – SONAR SYSTEM, ACTIVE SURVEILLANCE – XY SERIES,
– ESWBS 46200 – PASSIVE SURVEILLANCE SONAR,
– ESWBS 462XY – SONAR SYSTEMS, PASSIVE SURVEILLANCE – XY SERIES,
– ESWBS 46300 – MULTIPLE MODE SURVEILLANCE SONAR,
– ESWBS 463XY – MULTIPLE MODE SURVEILLANCE SONAR – XY SERIES,
– ESWBS 46400 – ACOUSTIC ANALYSIS SYSTEMS,
– ESWBS 46500 – BATHYTHERMOGRAPH,
– ESWBS 46510 – BATHYTHERMOGRAPH,
– ESWBS 46511 – BATHYTHERMOGRAPH,
– ESWBS 46600 – MULTI-PURPOSE SHIP EQUIPMENT SYSTEMS,
– ESWBS 46610 – LAMPS SHIPBOARD EQUIPMENT,
– ESWBS 46611 – LAMPS MK III EQUIPMENT,
– ESWBS 46612 – LAMPS MK I EQUIPMENT,
– ESWBS 46613 – LAMPS INTERFACE EQUIPMENT,
– ESWBS 46614 – LAMPS COMMUNICATION EQUIPMENT,
– ESWBS 46800 – SURFACE SHIP COMBAT SYSTEMS,
– ESWBS 468XY – COMBAT SYSTEM, SURFACE SHIP – XY SERIES,
– ESWBS 47000 – COUNTERMEASURE SYSTEMS,
– ESWBS 47010 – TESTING, ELECTRONIC COUNTERMEASURES INTRA-SYSTEM,
– ESWBS 47011 – TESTING, ELECTRONIC COUNTERMEASURES INTRA-SYSTEM,
– ESWBS 47100 – ACTIVE EW (INCL COMBINATION ACTIVE/PASSIVE),
– ESWBS 47110 – ELECTRONIC COUNTERMEASURES, ACTIVE,
– ESWBS 47111 – ELECTRONIC COUNTERMEASURES, ACTIVE,
– ESWBS 47200 – PASSIVE ECM,
– ESWBS 47210 – ELECTRONIC COUNTERMEASURES, PASSIVE,
– ESWBS 47211 – ELECTRONIC COUNTERMEASURES, PASSIVE,
– ESWBS 47300 – UNDERWATER COUNTERMEASURES,
– ESWBS 47310 – TORPEDO DECOYS,
– ESWBS 47311 – TORPEDO DECOYS,
– ESWBS 47400 – DECOY SYSTEMS,
– ESWBS 47410 – COUNTERMEASURES DECOYS,
– ESWBS 47411 – COUNTERMEASURES DECOYS,
– ESWBS 47500 – DEGAUSSING SYSTEMS,
– ESWBS 47510 – DEGAUSSING SYSTEMS,
– ESWBS 47511 – DEGAUSSING SYSTEMS,
– ESWBS 47600 – MINE COUNTERMEASURE SYSTEMS,
– ESWBS 47610 – MINESWEEPING SYSTEMS,
– ESWBS 47611 – MINESWEEPING SYSTEMS,
– ESWBS 47620 – MINEHUNTING SYSTEMS,
– ESWBS 47621 – MINEHUNTING SYSTEMS,
– ESWBS 48000 – FIRE CONTROL SYSTEMS,
– ESWBS 48010 – TESTING, GUN WARFARE INTRA-SYSTEM,
– ESWBS 48011 – TESTING, GUN WARFARE INTRA-SYSTEM,
– ESWBS 48020 – TESTING, GUIDED MISSILE INTRA-SYSTEM,
– ESWBS 48021 – TESTING, GUIDED MISSILE INTRA-SYSTEM,
– ESWBS 48030 – TESTING, ANTI-SUBMARINE WARFARE INTRA-SYSTEM,
– ESWBS 48031 – TESTING, ANTI-SUBMARINE WARFARE INTRA-SYSTEM,
– ESWBS 48100 – GUN FIRE CONTROL SYSTEMS,
– ESWBS 481XY – FIRE CONTROL SYSTEM, GUN – (MK XY GFCS SERIES),
– ESWBS 48200 – MISSILE FIRE CONTROL SYSTEMS,
– ESWBS 482XY – FIRE CONTROL SYSTEM, MISSILE (MK XY MFCS SERIES),
– ESWBS 48300 – UNDERWATER FIRE CONTROL SYSTEMS,
– ESWBS 483XY – FIRE CONTROL SYSTEM, ASW (MK XY UBFCS SERIES),
– ESWBS 48400 – INTEGRATED FIRE CONTROL SYSTEMS,
– ESWBS 48492 – GUN FIRE CONTROL SYSTEM,
– ESWBS 484XY – FIRE CONTROL SYSTEM (MK XY SERIES),
– ESWBS 48900 – WEAPON SYSTEMS SWITCHBOARDS,
– ESWBS 48960 – FIRE CONTROL SWITCHBOARD,
– ESWBS 489XY – WEAPON SYSTEMS SWITCHBOARDS (MK XY SERIES),
– ESWBS 49000 – SPECIAL PURPOSE SYSTEMS,
– ESWBS 49100 – ELECTRONIC TEST, CHECKOUT, AND MONITORING EQUIPMENT,
– ESWBS 49110 – ELECTRONIC TEST, CHECKOUT, AND MONITORING EQUIPMENT,
– ESWBS 49111 – ELECTRONIC TEST, CHECKOUT, AND MONITORING EQUIPMENT,
– ESWBS 49200 – FLIGHT CONTROL AND INSTRUMENT LANDING SYSTEMS,
– ESWBS 49220 – LANDING SYSTEMS, FRESNEL LENS OPTICAL (FLOLS),
– ESWBS 49221 – LANDING SYSTEMS, FRESNEL LENS OPTICAL (FLOLS),
– ESWBS 49230 – PILOT LANDING AID TELEVISION SYSTEM (PLAT),
– ESWBS 49231 – PILOT LANDING AID TELEVISION SYSTEM (PLAT),
– ESWBS 49240 – LANDING SIGNAL OFFICERS STATION SYSTEM (LSO),
– ESWBS 49241 – LANDING SIGNAL OFFICERS STATION SYSTEM (LSO),
– ESWBS 49250 – LANDING AID SYSTEM, MANUAL OPERATED VISUAL (MOVLAS),
– ESWBS 49251 – LANDING AID SYSTEM, MANUAL OPERATED VISUAL (MOVLAS),
– ESWBS 49260 – LIGHTING SYSTEM, VISUAL AID (AIR CAPABLE),
– ESWBS 49261 – LIGHTING SYSTEM, VISUAL AID (AIR CAPABLE),
– ESWBS 49300 – AUTOMATED DATA PROCESSING SYSTEMS (NON-COMBAT),
– ESWBS 49310 – MANAGEMENT DATA PROCESSING SYSTEMS,
– ESWBS 49311 – MANAGEMENT DATA PROCESSING SYSTEMS,
– ESWBS 49320 – MONITORING SYSTEM,
– ESWBS 49321 – MONITORING SYSTEM,
– ESWBS 49400 – METEOROLOGICAL SYSTEMS,
– ESWBS 49410 – METEOROLOGICAL SYSTEMS,
– ESWBS 49411 – METEOROLOGICAL SYSTEMS,
– ESWBS 49500 – SPECIAL PURPOSE INTELLIGENCE SYSTEMS,
– ESWBS 49510 – INTELLIGENCE SYSTEMS, INTEGRATED OPERATIONAL,
– ESWBS 49511 – INTELLIGENCE SYSTEMS, INTEGRATED OPERATIONAL,
– ESWBS 49520 – INTELLIGENCE SYSTEM, NAVAL PROCESSING (NIPS),
– ESWBS 49521 – INTELLIGENCE SYSTEM, NAVAL PROCESSING (NIPS),
– ESWBS 49530 – TACTICAL SUPPORT CENTER,
– ESWBS 49531 – TACTICAL SUPPORT CENTER,
– ESWBS 49800 – COMMAND AND SURVEILLANCE OPERATING FLUIDS,
– ESWBS 49900 – COMMAND AND SURV. REPAIR PARTS AND SPECIAL TOOLS,
– ESWBS 49910 – COMMAND AND SURVEILLANCE MISCELLANEOUS PARTS,
– ESWBS 49911 – COMMAND AND SURVEILLANCE MISCELLANEOUS PARTS,
– ESWBS 49920 – COMMAND AND SURVEILLANCE SPECIAL TOOLS,
– ESWBS 49921 – COMMAND AND SURVEILLANCE SPECIAL TOOLS,
– ESWBS 49930 – MAINTENANCE ASSIST MODULE (MAM) KITS,
– ESWBS 49931 – MAINTENANCE ASSIST MODULE (MAM) KITS,
– ESWBS 49931 – ,
– ESWBS 5000 – SHIP SYSTEM PERFORMANCE,
– ESWBS 50000 – AUXILIARY SYSTEMS, GENERAL,
– ESWBS 50100 – GENERAL ARRANGEMENT-AUXILIARY SYSTEMS DRAWINGS,
– ESWBS 50200 – AUXILIARY MACHINERY,
– ESWBS 50300 – PUMPS,
– ESWBS 50400 – INSTRUMENTS AND INSTRUMENT BOARDS,
– ESWBS 50500 – GENERAL PIPING REQUIREMENTS,
– ESWBS 50600 – OVERFLOWS, AIR ESCAPES, AND SOUNDING TUBES,
– ESWBS 50700 – MACHINERY AND PIPING DESIGNATION AND MARKING,
– ESWBS 50800 – THERMAL INSULATION FOR PIPING AND MACHINERY,
– ESWBS 50810 – LAGGING REMOVAL AND INSTALLATION (NOW 8655),
– ESWBS 50811 – REMOVAL WITHIN MACHINERY SPACES (NOW 8655),
– ESWBS 50812 – REMOVAL OUTSIDE MACHINERY SPACES (NOW 8655),
– ESWBS 50813 – INSTALLATION MACHINERY SPACES (SHIP'S FORCE) (NOW 8655),
– ESWBS 50814 – INSTALLATION OUTSIDE MACH. SPACES (SHIP'S FORCE)(NOW 8655),
– ESWBS 50815 – OSHA (NOW 86591),
– ESWBS 50900 – THERMAL INSULATION FOR VENT AND A/C DUCTS,
– ESWBS 5100 – SHIP SYSTEM PERFORMANCE CONCEPTS,
– ESWBS 51000 – CLIMATE CONTROL,
– ESWBS 51100 – COMPARTMENT HEATING SYSTEM,
– ESWBS 51110 – HEATING SYSTEMS,
– ESWBS 51111 – HEATING SYSTEM,
– ESWBS 51200 – VENTILATION SYSTEM,
– ESWBS 51210 – VENTILATION SYSTEM, NON-MACHINERY PROPULSION SPACES,
– ESWBS 51211 – VENTILATION SYSTEM, NON-MACHINERY PROPULSION SPACES,
– ESWBS 51300 – MACHINERY SPACE VENTILATION SYSTEM,
– ESWBS 51310 – VENTILATION SYSTEM, MACHINERY SPACES,
– ESWBS 51311 – VENTILATION SYSTEM, MACHINERY SPACE,
– ESWBS 51400 – AIR CONDITIONING SYSTEM,
– ESWBS 51410 – WATER, CHILLED, COOLING DISTRIBUTION,
– ESWBS 51411 – WATER, CHILLED, COOLING DISTRIBUTION,
– ESWBS 51420 – AIR CONDITIONING PLANTS,
– ESWBS 51421 – AIR CONDITIONING PLANT – NO. 1,
– ESWBS 51422 – AIR CONDITIONING PLANT – NO. 2,
– ESWBS 51423 – AIR CONDITIONING PLANT – NO. 3,
– ESWBS 51424 – AIR CONDITIONING PLANT – NO. 4,
– ESWBS 51430 – AIR CONDITIONING UNITS, SELF CONTAINED,
– ESWBS 51431 – AIR CONDITIONING UNITS, SELF CONTAINED,
– ESWBS 51600 – REFRIGERATION SYSTEM,
– ESWBS 51610 – REFRIGERATION, SHIP SERVICE,
– ESWBS 51611 – REFRIGERATION, SHIP SERVICE,
– ESWBS 51620 – REFRIGERATION, CARGO,
– ESWBS 51621 – REFRIGERATION, CARGO,
– ESWBS 51700 – AUXILIARY BOILERS AND OTHER HEAT SOURCES,
– ESWBS 51710 – BOILERS, AUXILIARY,
– ESWBS 51711 – BOILER, AUXILIARY – NO. 1,
– ESWBS 51712 – BOILER, AUXILIARY – NO. 2,
– ESWBS 51713 – BOILER, AUXILIARY – NO. 3,
– ESWBS 51720 – WASTE HEAT SYSTEMS,
– ESWBS 51721 – WASTE HEAT SYSTEMS,
– ESWBS 51730 – REBOILER (WITHIN MACHINERY SPACES),
– ESWBS 51731 – REBOILER,
– ESWBS 5200 – SHIP SUBSYSTEM PERFORMANCE CONCEPTS,
– ESWBS 52000 – SEA WATER SYSTEMS,
– ESWBS 52010 – SEA VALVES,
– ESWBS 52011 – SEA VALVES,
– ESWBS 52100 – FIREMAIN AND FLUSHING (SEA WATER) SYSTEM,
– ESWBS 52110 – PIPING, FIREMAIN AND FLUSHING,
– ESWBS 52111 – PIPING, FIREMAIN AND FLUSHING,
– ESWBS 52120 – PUMPS, FIREMAIN AND FLUSHING,
– ESWBS 52121 – PUMPS, FIREMAIN AND FLUSHING #1,
– ESWBS 52122 – PUMPS, FIREMAIN AND FLUSHING #2,
– ESWBS 52123 – PUMPS, FIREMAIN AND FLUSHING #3,
– ESWBS 52124 – PUMPS, FIREMAIN AND FLUSHING #4,
– ESWBS 52200 – SPRINKLER SYSTEM,
– ESWBS 52210 – SPRINKLER SYSTEMS, SEA WATER,
– ESWBS 52211 – SPRINKLER SYSTEMS, SEA WATER,
– ESWBS 52300 – WASHDOWN SYSTEM,
– ESWBS 52310 – COUNTERMEASURE WASHDOWN SYSTEM,
– ESWBS 52311 – COUNTERMEASURE WASHDOWN SYSTEM,
– ESWBS 52400 – AUXILIARY SEA WATER SYSTEM,
– ESWBS 52410 – AUXILIARY MACHINERY SEA WATER SYSTEM,
– ESWBS 52411 – AUXILIARY MACHINERY SEA WATER SYSTEM,
– ESWBS 52420 – PUMPS, AUXILIARY MACHINERY SEA WATER,
– ESWBS 52421 – PUMPS, AUXILIARY MACHINERY SEA WATER,
– ESWBS 52600 – SCUPPERS AND DECK DRAINS,
– ESWBS 52610 – SCUPPERS AND DECK DRAINS,
– ESWBS 52611 – DRAINS, DECK,
– ESWBS 52612 – SCUPPERS,
– ESWBS 52700 – FIREMAIN ACTUATED SERVICES – OTHER,
– ESWBS 52800 – PLUMBING DRAINAGE,
– ESWBS 52810 – DRAINS, PLUMBING,
– ESWBS 52811 – DRAINS, PLUMBING,
– ESWBS 52900 – DRAINAGE AND BALLASTING SYSTEM,
– ESWBS 52910 – PIPING, DRAINAGE AND BALLASTING SYSTEM,
– ESWBS 52911 – PIPING, DRAINAGE AND BALLASTING SYSTEM,
– ESWBS 52920 – PUMPS AND CONTROLLERS, DRAINAGE AND BALLASTING SYSTEM,
– ESWBS 52921 – PUMPS AND CONTROLLERS, DRAINAGE AND BALLASTING SYSTEM,
– ESWBS 52960 – COMPRESSORS, AIR DEBALLAST,
– ESWBS 52961 – COMPRESSORS, AIR DEBALLAST,
– ESWBS 5300 – SELECTED CONCEPTS,
– ESWBS 53000 – FRESH WATER SYSTEMS,
– ESWBS 53100 – DISTILLING PLANT,
– ESWBS 53110 – DISTILLING PLANT, FLASH TYPE,
– ESWBS 53111 – DISTILLING PLANT, FLASH TYPE – NO. 1,
– ESWBS 53112 – DISTILLING PLANT, FLASH TYPE – NO. 2,
– ESWBS 53120 – DISTILLING PLANT, VAPOR COMPRESSION,
– ESWBS 53121 – DISTILLING PLANT, VAPOR COMPRESSION – NO. 1,
– ESWBS 53122 – DISTILLING PLANT, VAPOR COMPRESSION – NO. 2,
– ESWBS 53130 – DISTILLING PLANT, HEAT RECOVERY,
– ESWBS 53131 – DISTILLING PLANT, HEAT RECOVERY – NO. 1,
– ESWBS 53132 – DISTILLING PLANT, HEAT RECOVERY – NO. 2,
– ESWBS 53140 – DISTILLING PLANT, SUBMERGED TUBE TYPE,
– ESWBS 5314X – DISTILLING PLANT, SUBMERGED TUBE TYPE – NO. X,
– ESWBS 53150 – DISTILLING PLANT, REVERSE OSMOSIS,
– ESWBS 53151 – DISTILLING PLANT, REVERSE OSMOSIS,
– ESWBS 53160 – DISTILLING PLANT, BASKET TYPE,
– ESWBS 53161 – DISTILLING PLANT, BASKET TYPE,
– ESWBS 53200 – COOLING WATER,
– ESWBS 53210 – COOLING WATER, ELECTRONICS, DW/CW,
– ESWBS 53211 – COOLING WATER, ELECTRONICS, DW/CW,
– ESWBS 53300 – POTABLE WATER,
– ESWBS 53310 – WATER, POTABLE SERVICE,
– ESWBS 53311 – WATER, POTABLE SERVICE,
– ESWBS 53320 – DISTILLED WATER SERVICE,
– ESWBS 53321 – DISTILLED WATER SERVICE,
– ESWBS 53400 – AUXILIARY STEAM AND DRAINS WITHIN MACHINERY BOX,
– ESWBS 53410 – AUXILIARY STEAM SYSTEM, PIPING AND CONTROLS,,
– ESWBS 5341X – AUXILIARY STEAM SYSTEM, PIPING AND CONTROLS – SHAFT X,
– ESWBS 53420 – GLAND SEAL AND VENT EXHAUST SYSTEMS,
– ESWBS 5342X – GLAND SEAL AND VENT EXHAUST SYSTEM – SHAFT X,
– ESWBS 53430 – GLAND LEAK-OFF SYSTEMS, AUXILIARY,
– ESWBS 5343X – GLAND LEAK-OFF SYSTEM, AUXILIARY – SHAFT X,
– ESWBS 53440 – STEAM EXHAUST/ESCAPE SYSTEM, AUXILIARY,
– ESWBS 5344X – STEAM EXHAUST/ESCAPE SYSTEM – SHAFT X,
– ESWBS 53450 – DRAIN COLLECTING SYSTEM, FRESH WATER,
– ESWBS 5345X – DRAIN COLLECTING SYSTEM, FRESH WATER – SHAFT X,
– ESWBS 53460 – DRAIN SYSTEM, CONTAMINATED,
– ESWBS 53461 – DRAIN SYSTEM, CONTAMINATED,
– ESWBS 53470 – DRAIN SYSTEM, LOW PRESSURE STEAM,
– ESWBS 53471 – DRAIN SYSTEM, LOW PRESSURE STEAM,
– ESWBS 53500 – AUXILIARY STEAM AND DRAINS OUTSIDE MACHINERY BOX,
– ESWBS 53510 – AUXILIARY STEAM AND DRAINS,
– ESWBS 53511 – AUXILIARY STEAM AND DRAINS OUTSIDE MACHINERY SPACES,
– ESWBS 53600 – AUXILIARY FRESH WATER COOLING,
– ESWBS 53610 – AUXILIARY FRESH WATER COOLING,
– ESWBS 53611 – AUXILIARY FRESH WATER COOLING,
– ESWBS 53620 – COOLING WATER, ELECTRONICS, DW/SW,
– ESWBS 53621 – COOLING WATER, ELECTRONICS, DW/SW,
– ESWBS 5400 – COMPONENT DEVELOPMENT,
– ESWBS 54000 – FUELS AND LUBRICANTS, HANDLING AND STORAGE,
– ESWBS 54100 – SHIP FUEL AND FUEL COMPENSATING SYSTEM,
– ESWBS 54110 – SHIP FUEL, FILLING, AND TRANSFER SYS (NON-COMPSG/COMPSG),
– ESWBS 54111 – SHIP FUEL, FILLING, AND TRANSFER SYSTEM, NON-COMPENSATING,
– ESWBS 54112 – SHIP FUEL, FILLING, AND TRANSFER SYSTEM, COMPENSATING,
– ESWBS 54120 – PUMPS AND PURIFIERS, FUEL TRANSFER, NON-COMPSG/COMPSG SYS,
– ESWBS 54121 – PUMPS, FUEL TRANSFER, NON-COMPENSATING/COMPENSATING SYS,
– ESWBS 54122 – PURIFIERS, FUEL TRANSFER, NON-COMPSG/COMPSG SYS,
– ESWBS 54200 – AVIATION AND GENERAL PURPOSE FUELS,
– ESWBS 54210 – PIPING, AVIATION AND GENERAL PURPOSE FUEL SYSTEM,
– ESWBS 54211 – PIPING, AVIATION AND GENERAL PURPOSE FUEL SYSTEM,
– ESWBS 54220 – PUMPS AND PURIFIERS, AVIATION AND GENERAL PURPOSE FUEL,
– ESWBS 54221 – PUMPS AND PURIFIERS, AVIATION AND GENERAL PURPOSE FUEL,
– ESWBS 54222 – PURIFIERS, AVIATION AND GENERAL PURPOSE FUEL,
– ESWBS 54230 – MOGAS HANDLING AND PIPING,
– ESWBS 54231 – MOGAS HANDLING AND PIPING,
– ESWBS 54300 – AVIATION AND GENERAL PURPOSE LUBRICATING OIL,
– ESWBS 54310 – LUBE OIL SYSTEM, AVIATION AND GENERAL PURPOSE,
– ESWBS 54311 – LUBE OIL SYSTEM, AVIATION AND GENERAL PURPOSE,
– ESWBS 54400 – LIQUID CARGO,
– ESWBS 54410 – LIQUID CARGO HANDLING SYSTEMS,
– ESWBS 54411 – LIQUID CARGO HANDLING (FUEL),
– ESWBS 54412 – LIQUID CARGO HANDLING (JP-5),
– ESWBS 54413 – LIQUID CARGO HANDLING (MOGAS),
– ESWBS 54414 – LIQUID CARGO HANDLING (AVGAS),
– ESWBS 54415 – LIQUID CARGO HANDLING (LUBE OIL),
– ESWBS 54420 – PUMPS AND CONTROLLERS, LIQUID CARGO HANDLING,
– ESWBS 54421 – PUMPS AND CONTROLLERS, LIQUID CARGO HANDLING (FUEL),
– ESWBS 54422 – PUMPS AND CONTROLLERS, LIQUID CARGO HANDLING (JP-5),
– ESWBS 54423 – PUMPS AND CONTROLLERS, LIQUID CARGO HANDLING (MOGAS),
– ESWBS 54424 – PUMPS AND CONTROLLERS, LIQUID CARGO HANDLING (AVGAS),
– ESWBS 54425 – PUMPS AND CONTROLLERS, LIQUID CARGO HANDLING (LUBE OIL),
– ESWBS 54500 – TANK HEATING,
– ESWBS 54510 – TANK HEATING SYSTEM,
– ESWBS 54511 – TANK HEATING SYSTEM,
– ESWBS 54600 – AUXILIARY LUBRICATION SYSTEMS,
– ESWBS 54610 – LUBRICATION, OUTBOARD,
– ESWBS 54611 – LUBRICATION, OUTBOARD,
– ESWBS 54620 – LUBRICATION, INBOARD,
– ESWBS 54621 – LUBRICATION, INBOARD,
– ESWBS 54900 – SPECIAL FUEL AND LUBRICANTS, HANDLING AND STOWAGE,
– ESWBS 55000 – AIR, GAS, AND MISCELLANEOUS FLUID SYSTEMS,
– ESWBS 55100 – COMPRESSED AIR SYSTEMS,
– ESWBS 55110 – AIR SYSTEM, HIGH PRESSURE,
– ESWBS 55111 – AIR SYSTEM, HIGH PRESSURE,
– ESWBS 55120 – AIR SYSTEM, LOW AND MEDIUM PRESSURE,
– ESWBS 55121 – AIR SYSTEM, LOW AND MEDIUM PRESSURE,
– ESWBS 55122 – PRAIRIE MASKER, NON GAS TURBINE SHIPS,
– ESWBS 55130 – AIR SYSTEM, DRY,
– ESWBS 55131 – AIR SYSTEM, DRY,
– ESWBS 55150 – COMPRESSORS, AIR,
– ESWBS 55151 – COMPRESSORS, HP AIR,
– ESWBS 55152 – COMPRESSORS, MP AIR,
– ESWBS 55153 – COMPRESSORS, LP AIR,
– ESWBS 55160 – BLEED AIR SYSTEM,
– ESWBS 55161 – MASKER AIR SYSTEM,
– ESWBS 55162 – PRAIRIE AIR SYSTEM,
– ESWBS 55163 – STARTING AIR SYSTEM,
– ESWBS 55164 – ANTI-ICING AIR SYSTEM,
– ESWBS 55165 – AIR SYSTEMS, PRAIRIE MASKER (DELETED – SEE 55122),
– ESWBS 55166 – BLEED AIR MAIN,
– ESWBS 55190 – EMERGENCY BREATHING AIR SYSTEM (AEB),
– ESWBS 55191 – EMERGENCY BREATHING AIR SYSTEM (AEB),
– ESWBS 55200 – COMPRESSED GASES,
– ESWBS 55210 – COMPRESSED GAS SYSTEM, NITROGEN,
– ESWBS 55211 – NITROGEN STOWAGE AND DISTRIBUTION SYSTEM,
– ESWBS 55300 – O2 N2 SYSTEM,
– ESWBS 55310 – O2 N2 STORAGE AND DISTRIBUTION SYSTEM,
– ESWBS 55311 – O2 N2 STOWAGE AND DISTRIBUTION SYSTEM,
– ESWBS 55320 – COMPRESSORS, O2N2,
– ESWBS 55321 – COMPRESSOR, O2N2 – HP,
– ESWBS 55322 – COMPRESSOR, O2N2 – LP,
– ESWBS 55330 – O2N2 PLANTS,
– ESWBS 55331 – O2N2 PLANTS, HP,
– ESWBS 55332 – O2N2 PLANTS, LP,
– ESWBS 55400 – MAIN BALLAST TANK BLOW AND LIST CONTROL SYSTEM,
– ESWBS 55410 – LOW PRESSURE BLOW SYSTEM (ABT),
– ESWBS 55411 – LOW PRESSURE BLOW SYSTEM (ABT),
– ESWBS 55420 – EMERGENCY MAIN BALLAST TANK BLOW AND LIST CONTROL,
– ESWBS 55421 – EMERGENCY MAIN BALLAST TANK BLOW AND LIST CONTROL,
– ESWBS 55500 – FIRE EXTINGUISHING SYSTEMS,
– ESWBS 55510 – FOG, FOAM AND AFFF SYSTEMS,
– ESWBS 55511 – FOG, FOAM AND AFFF, WITHIN MACHINERY SPACES,
– ESWBS 55512 – FOG, FOAM AND AFFF, OUTSIDE MACHINERY SPACES,
– ESWBS 55513 – FOG, FOAM AND AFFF, SUPPLY/TRANSFER STATIONS,
– ESWBS 55520 – FIRE EXTINGUISHING SYSTEMS, DRY CHEMICAL,
– ESWBS 55521 – FIRE EXTINGUISHING SYSTEMS, DRY CHEMICAL,
– ESWBS 55530 – FIRE EXTINGUISHING SYSTEMS, CO2 & HALON,
– ESWBS 55531 – FIRE EXTINGUISHING SYSTEMS, CO2,
– ESWBS 55532 – FIRE EXTINGUISHING SYSTEMS, HALON,
– ESWBS 55540 – FIRE EXTINGUISHING SYSTEMS, STEAM SMOTHERING,
– ESWBS 55541 – FIRE EXTINGUISHING SYSTEMS, STEAM SMOTHERING,
– ESWBS 55550 – FIRE EXTINGUISHING SYSTEMS, FRESH WATER,
– ESWBS 55551 – FIRE EXTINGUISHING SYSTEMS, FRESH WATER,
– ESWBS 55560 – FIRE EXTINGUISHING SYSTEM, DEEP FAT FRYER,
– ESWBS 55561 – FIRE EXTINGUISHING SYSTEM, DEEP FAT FRYER,
– ESWBS 55570 – FIRE EXTINGUISHING SYSTEM, TWIN AGENT,
– ESWBS 55571 – FIRE EXTINGUISHING SYSTEM, TWIN AGENT,
– ESWBS 55590 – FIRE EXTINGUISHING SYSTEM, NITROGEN SUPPRESSION,
– ESWBS 55591 – FIRE EXTINGUISHING SYSTEM, NITROGEN SUPPRESSION,
– ESWBS 55600 – HYDRAULIC FLUID SYSTEM,
– ESWBS 55610 – HYDRAULIC POWER SYSTEM, SHIP'S SERVICE,
– ESWBS 55611 – HYDRAULIC POWER SYSTEM, SHIP'S SERVICE – NO. 1,
– ESWBS 55612 – HYDRAULIC POWER SYSTEM, SHIP'S SERVICE – NO. 2,
– ESWBS 55700 – LIQUID GASES, CARGO,
– ESWBS 55800 – SPECIAL PIPING SYSTEMS,
– ESWBS 55810 – PIPING SYSTEMS, SPECIAL,
– ESWBS 55811 – PIPING SYSTEMS, SPECIAL,
– ESWBS 56000 – SHIP CONTROL SYSTEMS,
– ESWBS 56100 – STEERING AND DIVING CONTROL SYSTEMS,
– ESWBS 56110 – STEERING SYSTEM,
– ESWBS 56111 – STEERING GEAR NO. 1- STBD,
– ESWBS 56112 – STEERING GEAR NO. 2 – PORT,
– ESWBS 56200 – RUDDER,
– ESWBS 56210 – RUDDER,
– ESWBS 56211 – RUDDER,
– ESWBS 56320 – DEPTH AND CAPACITY GAGE SYSTEM (CG),
– ESWBS 56321 – DEPTH AND CAPACITY GAGE SYSTEM (CG),
– ESWBS 56330 – HOVERING SYSTEM (HOV),
– ESWBS 56331 – HOVERING SYSTEM (HOV),
– ESWBS 56450 – CAVITY DRAIN SYSTEM (FORMERLY 5642 & 56421),
– ESWBS 56451 – CAVITY DRAIN SYSTEM (FORMERLY 5642 & 56421),
– ESWBS 56460 – VENTILATION CONDENSATE DRAIN SYSTEM,
– ESWBS 56461 – VENTILATION CONDENSATE DRAIN SYSTEM,
– ESWBS 56500 – TRIM AND HEEL SYSTEMS (SURFACE SHIPS),
– ESWBS 56510 – STABILIZING FINS,
– ESWBS 56511 – FIN STABILIZER SYSTEM #1 – STBD,
– ESWBS 56512 – FIN STABILIZER SYSTEM #2 – PORT,
– ESWBS 56521 – ROLL STABILIZATION SYSTEM #1,
– ESWBS 56522 – ROLL STABILIZATION SYSTEM #2,
– ESWBS 56531 – HEELING SYSTEM #1,
– ESWBS 56532 – HEELING SYSTEM #2,
– ESWBS 56533 – HEELING SYSTEM #3,
– ESWBS 56700 – STRUT AND FOIL SYSTEMS,
– ESWBS 56710 – HYDROFOILS,
– ESWBS 56711 – HYDROFOILS,
– ESWBS 56800 – MANEUVERING SYSTEMS,
– ESWBS 56810 – STEERING CONTROL THRUSTERS,
– ESWBS 56811 – THRUSTER SYSTEM #1, BOW,
– ESWBS 56812 – THRUSTER SYSTEM #2, STERN,
– ESWBS 57000 – REPLENISHMENT SYSTEMS,
– ESWBS 57010 – TESTING, UNDERWAY REPLENISHMENT-AT-SEA (RAS),
– ESWBS 57011 – TESTING, UNDERWAY REPLENISHMENT-AT-SEA (RAS),
– ESWBS 57100 – REPLENISHMENT-AT-SEA SYSTEMS,
– ESWBS 57110 – REPLENISHMENT-AT-SEA (RAS) WINCHES,
– ESWBS 57120 – REPLENISHMENT-AT-SEA – RAM-TENSIONING DEVICES,
– ESWBS 57121 – REPLENISHMENT-AT-SEA RAM-TENSIONING DEVICES,
– ESWBS 57130 – RAS TRANSFER HEADS, SLIDING BLOCKS AND SLIDING PADEYES,
– ESWBS 57131 – RAS TRANSFER HEADS, SLIDING BLOCKS AND SLIDING PADEYES,
– ESWBS 57140 – REPLENISHMENT-AT-SEA BOOMS, RIGGING AND HARDWARE,
– ESWBS 57141 – REPLENISHMENT-AT-SEA BOOMS, RIGGING AND HARDWARE,
– ESWBS 57150 – CONTROL STATIONS, REPLENISHMENT-AT-SEA,
– ESWBS 57151 – CONTROL STATIONS, REPLENISHMENT-AT-SEA,
– ESWBS 57200 – SHIP STORES AND EQUIPMENT HANDLING SYSTEMS,
– ESWBS 57210 – SHIP STORES HANDLING EQUIPMENT,
– ESWBS 57211 – SHIP STORES HANDLING EQUIPMENT, NON-PORTABLE,
– ESWBS 57212 – SHIP STORES HANDLING EQUIPMENT, PORTABLE,
– ESWBS 57300 – CARGO HANDLING SYSTEMS,
– ESWBS 57310 – CARGO HANDLING, ELEVATORS,
– ESWBS 57311 – CARGO HANDLING, ELEVATOR -CARGO HOIST NO. 1,
– ESWBS 57312 – CARGO HANDLING, ELEVATOR -CARGO HOIST NO. 2,
– ESWBS 57313 – CARGO HANDLING, ELEVATOR -CARGO HOIST NO. 3,
– ESWBS 57320 – CONVEYORS, CARGO,
– ESWBS 57321 – CONVEYORS, CARGO – VERTICAL PACKAGE,
– ESWBS 57322 – CONVEYORS, CARGO – PALLET CONVEYORS,
– ESWBS 57330 – HANDLING EQUIPMENT, CARGO, BELOW DECK,
– ESWBS 57331 – HANDLING, BELOW DECKS CARGO – MONORAIL,
– ESWBS 57332 – HANDLING, BELOW DECKS CARGO – PALLET TRANSPORTER,
– ESWBS 57333 – HANDLING, BELOW DECKS CARGO – ROLLER CONVEYORS,
– ESWBS 57340 – FORK LIFT TRUCKS,
– ESWBS 57341 – FORK LIFT TRUCKS,
– ESWBS 57342 – CONTAINER LIFT TRUCK,
– ESWBS 57350 – WINCHES, CARGO HANDLING,
– ESWBS 57351 – WINCHES, CARGO HANDLING,
– ESWBS 57352 – WINCHES, [CARGO & BUOY DECK] SUPPORT,
– ESWBS 57360 – CARGO BOOMS, RIGGING AND MISCELLANEOUS HARDWARE,
– ESWBS 57361 – CARGO BOOMS, RIGGING AND MISCELLANEOUS HARDWARE
"CARGO BOOMS",
– ESWBS 57362 – CARGO BOOMS, RIGGING AND MISCELLANEOUS HARDWARE "RIGGING",
– ESWBS 57363 – CARGO BOOMS, RIGGING AND MISCELLANEOUS HARDWARE "SLEWING GEAR" [157 FT WLM],
– ESWBS 57364 – CARGO BOOMS, RIGGING AND MISCELLANEOUS HARDWARE "CONTROLS",
– ESWBS 57371 – ATON BUOY DECK EQUIPMENT – CHAIN STOPPER – MANUAL,
– ESWBS 57372 – ATON BUOY DECK EQUIPMENT – CHAIN STOPPER – AUTOMATIC,
– ESWBS 57373 – ATON BUOY DECK EQUIPMENT – BUOY CHAIN WINCH (225ft WLB / 175 ft WLM),
– ESWBS 57374 – ATON BUOY DECK EQUIPMENT – A-FRAME (BUSL, etc.),
– ESWBS 57400 – VERTICAL REPLENISHMENT SYSTEMS,
– ESWBS 57410 – VERTICAL REPLENISHMENT SYSTEMS (VERTREP),
– ESWBS 57411 – VERTICAL REPLENISHMENT SYSTEMS (VERTREP),
– ESWBS 57500 – VEHICLE HANDLING AND STOWAGE SYSTEMS,
– ESWBS 58000 – MECHANICAL HANDLING SYSTEMS,
– ESWBS 58100 – ANCHOR HANDLING AND STOWAGE SYSTEMS,
– ESWBS 58110 – ANCHOR HANDLING AND STOWAGE,
– ESWBS 58111 – ANCHOR HANDLING AND STOWAGE NO.1, STBD,
– ESWBS 58112 – ANCHOR HANDLING AND STOWAGE NO.2 ,PORT,
– ESWBS 58200 – MOORING AND TOWING SYSTEMS,
– ESWBS 58210 – MOORING AND TOWING,
– ESWBS 58211 – MOORING AND TOWING, Wire Rope Mooring Unit #1,
– ESWBS 58212 – MOORING AND TOWING, Wire Rope Mooring Unit #2,
– ESWBS 58213 – MOORING AND TOWING, Wire Rope Mooring Unit #3,
– ESWBS 58214 – MOORING AND TOWING, Wire Rope Mooring Unit #4,
– ESWBS 58221 – MOORING SYSTEMS – MANUAL, Capstan Unit #1,
– ESWBS 58222 – MOORING SYSTEMS – MANUAL, Capstan Unit #2,
– ESWBS 58223 – MOORING SYSTEMS – MANUAL, Capstan Unit #3,
– ESWBS 58231 – MOORING HAWSERS & ACCESSORIES – Synthetic Towing Hawsers,
– ESWBS 58232 – MOORING HAWSERS & ACCESSORIES – Bitts,
– ESWBS 58233 – MOORING HAWSERS & ACCESSORIES – Chocks,
– ESWBS 58241 – TOWING SYSTEMS – AUTOMATIC – Towing Winch,
– ESWBS 58251 – TOWING SYSTEMS – Manually Operated – Towing Capstan,
– ESWBS 58252 – TOWING SYSTEMS – Towing Bitt,
– ESWBS 58253 – TOWING SYSTEMS – Towing Chocks,
– ESWBS 58254 – TOWING SYSTEMS – Towing Padeyes,
– ESWBS 58261 – TOWING HAWSERS & ACCESSORIES – Towing Wires,
– ESWBS 58262 – TOWING HAWSERS & ACCESSORIES – Synthetic Towing Hawser,
– ESWBS 58300 – BOATS, BOAT HANDLING AND STOWAGE SYSTEMS,
– ESWBS 58310 – BOAT HANDLING AND STOWAGE,
– ESWBS 58311 – BOAT HANDLING AND STOWAGE – Manual Davit Systems,
– ESWBS 58312 – BOAT HANDLING AND STOWAGE – Crescent Davit Systems,
– ESWBS 58313 – BOAT HANDLING AND STOWAGE – Single Point Davit Systems,
– ESWBS 58314 – BOAT HANDLING AND STOWAGE – Other Davit Systems,
– ESWBS 58315 – BOAT HANDLING AND STOWAGE – Slings and Spreaders – for Crane Launched Boats,
– ESWBS 58316 – BOAT HANDLING AND STOWAGE – Hydraulic Power Systems (supporting davits),
– ESWBS 58320 – LIFESAVING EQUIPMENT (OTHER THAN BOATS),
– ESWBS 58321 – LIFESAVING EQUIPMENT, LIFERAFTS,
– ESWBS 58322 – LIFESAVING EQUIPMENT – Liferaft Rack and Launching systems,
– ESWBS 58323 – LIFESAVING EQUIPMENT – Emergency Escape Devices,
– ESWBS 58324 – LIFESAVING EQUIPMENT – Other lifesaving appliances,
– ESWBS 58330 – SMALL BOATS,
– ESWBS 58331 – SMALL BOATS – Standard Boats,
– ESWBS 58332 – SMALL BOATS – RHI Boats,
– ESWBS 58340 – LANDING CRAFT,
– ESWBS 58341 – LANDING CRAFT (LCVP),
– ESWBS 58342 – LANDING CRAFT – Motor Cargo Boat,
– ESWBS 58343 – LANDING CRAFT (LCM6),
– ESWBS 58344 – LANDING CRAFT (LCM8),
– ESWBS 58345 – LANDING CRAFT (LCU),
– ESWBS 58351 – SPECIAL DUTY BOATS – Arctic Survey Boat,
– ESWBS 58400 – LANDING CRAFT HANDLING AND STOWAGE SYSTEMS,
– ESWBS 58410 – DOORS AND HATCHES, MECHANICALLY OPERATED,
– ESWBS 58411 – BOW DOORS,
– ESWBS 58412 – HANGAR DIVISION DOORS (DELETED-SEE 58821),
– ESWBS 58413 – ROLLER CURTAINS (DELETED-SEE 58821),
– ESWBS 58414 – HANGAR HATCHES (DELETED-SEE 58821),
– ESWBS 58415 – AIRCRAFT ELEVATOR DOORS (DELETED-SEE 58821),
– ESWBS 58416 – TRANSOM DOORS,
– ESWBS 58417 – HANGAR DOORS (DELETED-SEE 58821),
– ESWBS 58418 – MECHANICALLY OPERATED DOORS,
– ESWBS 58420 – MECHANICALLY OPERATED GATES,
– ESWBS 58421 – MECHANICALLY OPERATED GATES,
– ESWBS 58430 – MECHANICALLY OPERATED RAMPS,
– ESWBS 58431 – MECHANICALLY OPERATED RAMPS,
– ESWBS 58500 – ELEVATING AND RETRACTING GEAR,
– ESWBS 58600 – AIRCRAFT RECOVERY SUPPORT SYSTEMS,
– ESWBS 58610 – ARRESTING GEAR AND BARRICADES,
– ESWBS 58611 – ARRESTING GEAR PENDANT ENGINE ONE,
– ESWBS 58612 – ARRESTING GEAR PENDANT ENGINE TWO,
– ESWBS 58613 – ARRESTING GEAR PENDANT ENGINE THREE,
– ESWBS 58614 – ARRESTING GEAR PENDANT ENGINE FOUR,
– ESWBS 58615 – ARRESTING GEAR BARRICADE ENGINE,
– ESWBS 58800 – AIRCRAFT HANDLING, SERVICING AND STOWAGE,
– ESWBS 58810 – AIRCRAFT ELEVATORS,
– ESWBS 5881X – AIRCRAFT ELEVATOR – NO. X,
– ESWBS 58820 – HANDLING AND SUPPORT FACILITIES, AIRCRAFT/HELO,
– ESWBS 58821 – HANDLING AND SUPPORT FACILITIES, AIRCRAFT/HELICOPTER – Helicopter Hanger,
– ESWBS 58822 – HANDLING AND SUPPORT FACILITIES, AIRCRAFT/HELICOPTER – Helicopter Hanger Door System,
– ESWBS 58900 – MISCELLANEOUS MECHANICAL HANDLING SYSTEMS,
– ESWBS 58910 – CRANES, ROTATING,
– ESWBS 58911 – CRANES, ROTATING – Crane #1,
– ESWBS 58912 – CRANES, ROTATING – Crane #2,
– ESWBS 58913 – CRANES, ROTATING – Crane #3,
– ESWBS 58914 – CRANES, ROTATING – Crane #4,
– ESWBS 58915 – CRANES, ROTATING – Crane #5,
– ESWBS 58916 – CRANES, ROTATING – Crane #6,
– ESWBS 58920 – CRANES AND HOISTS,
– ESWBS 58921 – CRANES AND HOISTS – Overhead Crane #1,
– ESWBS 58922 – CRANES AND HOISTS – Overhead Crane #2,
– ESWBS 58923 – CRANES AND HOISTS – Overhead Crane #3,
– ESWBS 58930 – PERSONNEL ELEVATORS,
– ESWBS 58931 – PERSONNEL ELEVATOR – NO. 1,
– ESWBS 58932 – PERSONNEL ELEVATOR – NO. 2,
– ESWBS 58933 – PERSONNEL ELEVATOR – NO. 3,
– ESWBS 58950 – SLEWING STERN RAMP SYSTEM,
– ESWBS 58951 – STERN RAMP,
– ESWBS 58952 – STERN DOOR,
– ESWBS 58953 – HYDRAULIC SYSTEM,
– ESWBS 58954 – CONTROL SYSTEM,
– ESWBS 58960 – SIDEPORT RAMP SYSTEM,
– ESWBS 58961 – PORTABLE RAMP,
– ESWBS 58962 – SIDE DOORS,
– ESWBS 58963 – HINGED PLATFORM,
– ESWBS 58964 – HYDRAULIC SYSTEM,
– ESWBS 58965 – CONTROL SYSTEM,
– ESWBS 59000 – SPECIAL PURPOSE SYSTEMS,
– ESWBS 59100 – SCIENTIFIC AND OCEAN ENGINEERING SYSTEMS,
– ESWBS 59111 – OCEANOGRAPHIC RESEARCH WINCH SYSTEMS – O Winch #1,
– ESWBS 59112 – OCEANOGRAPHIC RESEARCH WINCH SYSTEMS – O Winch #2,
– ESWBS 59121 – TRAWL / CORE RESEARCH WINCH SYSTEMS – T/C Winch #1,
– ESWBS 59122 – TRAWL / CORE RESEARCH WINCH SYSTEMS – T/C Winch #2,
– ESWBS 59131 – SCIENCE RESEARCH WIRES AND CABLES – 3×19 Science Wire,
– ESWBS 59132 – SCIENCE RESEARCH WIRES AND CABLES -Electromechanical Cable,
– ESWBS 59133 – SCIENCE RESEARCH WIRES AND CABLES -Coax Cable,
– ESWBS 59141 – OVERBOARDING SYSTEMS – A / J Frame #2,
– ESWBS 59142 – OVERBOARDING SYSTEMS – A / J Frame #1,
– ESWBS 59151 – SUPPORT SYSTEMS – Sheave Systems,
– ESWBS 59152 – SUPPORT SYSTEMS – Oceanographic Support Equipment,
– ESWBS 59161 – WIRE CONTROL AND MONITORING SYSTEM,
– ESWBS 59162 – WIRE CONTROL AND MONITORING SYSTEMS,
– ESWBS 59200 – SWIMMER AND DIVER SUPPORT AND PROTECTION SYSTEMS,
– ESWBS 59210 – SWIMMER AND DIVER SUPPORT FACILITIES,
– ESWBS 59211 – SWIMMER AND DIVER SUPPORT FACILITIES,
– ESWBS 59212 – SCBA SUPPORT FACILITIES,
– ESWBS 59300 – ENVIRONMENTAL POLLUTION CONTROL SYSTEMS,
– ESWBS 59310 – SEWAGE AND WASTE WATER POLLUTION CONTROL SYSTEM,
– ESWBS 59311 – SEWAGE SYSTEM,
– ESWBS 59312 – PLUMBING WASTE WATER SYSTEM,
– ESWBS 59320 – OIL POLLUTION CONTROL SYSTEM,
– ESWBS 59321 – OIL POLLUTION CONTROL SYSTEM,
– ESWBS 59330 – SOLID AND INDUSTRIAL WASTE POLLUTION CONTROL,
– ESWBS 59331 – SOLID WASTE POLLUTION CONTROL,
– ESWBS 59332 – INDUSTRIAL WASTE POLLUTION CONTROL,
– ESWBS 59500 – TOWING, LAUNCHING AND HANDLING FOR UNDERWATER SYS.,
– ESWBS 59510 – TOWING, LAUNCHING, AND HANDLING FOR ACOUSTIC CM,
– ESWBS 59511 – TOWING, LAUNCHING, AND HANDLING FOR ACOUSTIC CM,
– ESWBS 59520 – TOWING, LAUNCHING, AND HANDLING FOR TOWED SONAR,
– ESWBS 59521 – TOWING, LAUNCHING, AND HANDLING FOR TOWED SONAR,
– ESWBS 59700 – SALVAGE SUPPORT SYSTEMS,
– ESWBS 59710 – SURVIVOR AND SALVAGE SUPPORT SYSTEM,
– ESWBS 59711 – SURVIVOR AND SALVAGE SUPPORT SYSTEM,
– ESWBS 59800 – AUXILIARY SYSTEMS OPERATING FLUIDS,
– ESWBS 59900 – AUXILIARY SYSTEMS REPAIR PARTS AND TOOLS,
– ESWBS 59910 – AUXILIARY SYSTEMS MISCELLANEOUS PARTS,
– ESWBS 59911 – AUXILIARY SYSTEMS MISCELLANEOUS PARTS,
– ESWBS 59920 – AUXILIARY SYSTEMS SPECIAL TOOLS,
– ESWBS 59921 – AUXILIARY SYSTEMS SPECIAL TOOLS,
– ESWBS 59921 – ,
– ESWBS 6000 – SUBSYSTEM CHARACTERISTICS (INTERFACES AND CNO CONT.),
– ESWBS 60000 – OUTFIT AND FURNISHINGS, GENERAL,
– ESWBS 60100 – GENERAL ARRANGEMENT – OUTFIT AND FURN. DRAWINGS,
– ESWBS 60200 – HULL DESIGNATING AND MARKING,
– ESWBS 60210 – LABEL PLATES (MANUFACTURE),
– ESWBS 60211 – LABEL PLATES (MANUFACTURE),
– ESWBS 60300 – DRAFT MARKS,
– ESWBS 60400 – LOCKS, KEYS, AND TAGS,
– ESWBS 60500 – RODENT AND VERMIN PROOFING,
– ESWBS 6100 – HULL STRUCTURE,
– ESWBS 61000 – SHIP FITTINGS,
– ESWBS 61100 – HULL FITTINGS,
– ESWBS 61110 – HULL FITTINGS,
– ESWBS 61111 – HULL FITTINGS,
– ESWBS 61200 – RAILS, STANCHIONS, AND LIFELINES,
– ESWBS 61210 – RAILS, STANCHIONS, AND LIFELINES,
– ESWBS 61211 – RAILS, STANCHIONS, AND LIFELINES,
– ESWBS 61220 – SAFETY NETS,
– ESWBS 61221 – SAFETY NETS,
– ESWBS 61300 – RIGGING AND CANVAS,
– ESWBS 61310 – RIGGING AND CANVAS (STANDING),
– ESWBS 61311 – RIGGING AND CANVAS (STANDING),
– ESWBS 6200 – PROPULSION PLANT,
– ESWBS 62000 – HULL COMPARTMENTATION,
– ESWBS 62100 – NON-STRUCTURAL BULKHEADS,
– ESWBS 62110 – NON-STRUCTURAL BULKHEADS,
– ESWBS 62111 – NON-STRUCTURAL BULKHEADS,
– ESWBS 62200 – FLOOR PLATES AND GRATINGS,
– ESWBS 62210 – FLOOR PLATES AND GRATINGS,
– ESWBS 62211 – FLOOR PLATES AND GRATINGS, WITHIN MACHINERY SPACES,
– ESWBS 62212 – FLOOR PLATES AND GRATINGS, OUTSIDE MACHINERY SPACES,
– ESWBS 62300 – LADDERS,
– ESWBS 62310 – LADDERS, OTHER THAN ACCOMMODATION,
– ESWBS 62311 – LADDERS WITHIN MACHINERY SPACES, OTHER THAN ACCOMMODATION,
– ESWBS 62312 – LADDERS OUTSIDE MACHINERY SPACES, OTHER THAN ACCOMMODATION,
– ESWBS 62320 – LADDERS, ACCOMMODATION,
– ESWBS 62321 – LADDERS, ACCOMMODATION,
– ESWBS 62400 – NON-STRUCTURAL CLOSURES,
– ESWBS 62410 – NON-STRUCTURAL CLOSURES,
– ESWBS 62411 – NON-STRUCTURAL CLOSURES, WITHIN MACHINERY SPACES,
– ESWBS 62500 – AIRPORTS, FIXED PORTLIGHTS, AND WINDOWS,
– ESWBS 62510 – AIRPORTS, FIXED PORTLIGHTS, AND WINDOWS,
– ESWBS 62511 – AIRPORTS, FIXED PORTLIGHTS, AND WINDOWS,
– ESWBS 6300 – ELECTRIC PLANT,
– ESWBS 63000 – PRESERVATIVES AND COVERINGS,
– ESWBS 63010 – CORROSION PREVENTIVE,
– ESWBS 63011 – CORROSION PREVENTIVE, LIQUID,
– ESWBS 63012 – CORROSION PREVENTIVE, PASTE,
– ESWBS 63013 – CORROSION PREVENTIVE, DESICCANT,
– ESWBS 63014 – CORROSION PREVENTIVE, DIELECTRIC MATERIAL INST,
– ESWBS 63100 – PAINTING,
– ESWBS 63110 – PAINTING, INTERIOR,
– ESWBS 63111 – PAINTING, BILGE,
– ESWBS 63112 – PAINTING, WITHIN MACHINERY SPACES,
– ESWBS 63113 – PAINTING, OUTSIDE MACHINERY SPACES,
– ESWBS 63120 – PAINTING, EXTERIOR,
– ESWBS 63121 – PAINTING, EXTERIOR,
– ESWBS 63130 – PAINTING AND BLASTING, UNDERWATER HULL, SURFACE SHIPS,
– ESWBS 63131 – PAINTING AND BLASTING, UNDERWATER HULL,
– ESWBS 63140 – PAINTING AND BLASTING, FREEBOARD, SURFACE SHIPS,
– ESWBS 63141 – PAINTING AND BLASTING, FREEBOARD, SURFACE SHIPS,
– ESWBS 63151 – PAINTING, EXTERIOR & BUILT-IN TANKS, SUBMARINES,
– ESWBS 63200 – ZINC AND METALLIC COATINGS,
– ESWBS 63210 – ZINC COATINGS,
– ESWBS 63211 – ZINC COATINGS,
– ESWBS 63212 – GALVANIZING,
– ESWBS 63220 – FLAME SPRAY ALUMINUM,
– ESWBS 63221 – FLAME SPRAY ALUMINUM, STRUCTURAL COATINGS,
– ESWBS 63222 – FLAME SPRAY ALUMINUM, STRUCTURAL COATINGS,
– ESWBS 63230 – METALLIC CLADDINGS AND METALLIC SPECIAL PURPOSE COATINGS,
– ESWBS 63231 – METALLIC CLADDINGS,
– ESWBS 63232 – METALLIC SPECIAL PURPOSE COATINGS,
– ESWBS 63300 – CATHODIC PROTECTION,
– ESWBS 63310 – CATHODIC PROTECTION, SACRIFICIAL ANODE,
– ESWBS 63311 – CATHODIC PROTECTION, SACRIFICIAL ANODE,
– ESWBS 63320 – CATHODIC PROTECTION, IMPRESSED CURRENT,
– ESWBS 63321 – CATHODIC PROTECTION, IMPRESSED CURRENT,
– ESWBS 63400 – DECK COVERING,
– ESWBS 63410 – DECK COVERING,
– ESWBS 63411 – DECK COVERING,
– ESWBS 63420 – DECK COVERING, NON-SKID FLIGHT AND HANGAR,
– ESWBS 63421 – DECK COVERING, NON-SKID FLIGHT AND HANGAR,
– ESWBS 63500 – HULL INSULATION,
– ESWBS 63510 – HULL INSULATION,
– ESWBS 63511 – HULL INSULATION,
– ESWBS 63600 – HULL DAMPING,
– ESWBS 63610 – HULL DAMPING,
– ESWBS 63611 – HULL DAMPING,
– ESWBS 63700 – SHEATHING,
– ESWBS 63710 – SHEATHING AND COVERING,
– ESWBS 63711 – SHEATHING AND COVERING,
– ESWBS 63800 – REFRIGERATED SPACES,
– ESWBS 63810 – SPACES, REFRIGERATED SHIP'S PROVISIONS,
– ESWBS 63811 – SPACES, REFRIGERATED SHIP'S PROVISIONS,
– ESWBS 63820 – SPACES, REFRIGERATED CARGO,
– ESWBS 63821 – SPACES, REFRIGERATED CARGO,
– ESWBS 63900 – RADIATION SHIELDING,
– ESWBS 63910 – RADIATION SHIELDING AND CANNING PLATES,
– ESWBS 63911 – RADIATION SHIELDING AND CANNING PLATES,
– ESWBS 6400 – COMMAND AND SURVEILLANCE,
– ESWBS 64000 – LIVING SPACES,
– ESWBS 64100 – OFFICER BERTHING AND MESSING SPACES,
– ESWBS 64110 – OFFICER BERTHING SPACES,
– ESWBS 64111 – OFFICER BERTHING SPACES,
– ESWBS 64120 – OFFICER MESSING SPACES,
– ESWBS 64121 – OFFICER MESSING SPACES,
– ESWBS 64200 – NONCOMMISSIONED OFFICER BERTHING AND MESSING SPACES,
– ESWBS 64210 – NONCOMMISSIONED OFFICER BERTHING SPACES,
– ESWBS 64211 – NONCOMMISSIONED OFFICER BERTHING SPACES,
– ESWBS 64220 – NONCOMMISSIONED OFFICER MESSING SPACES,
– ESWBS 64221 – NONCOMMISSIONED OFFICER MESSING SPACES,
– ESWBS 64300 – ENLISTED PERSONNEL BERTHING AND MESSING SPACES,
– ESWBS 64310 – ENLISTED PERSONNEL BERTHING SPACES,
– ESWBS 64311 – ENLISTED PERSONNEL BERTHING SPACES,
– ESWBS 64320 – ENLISTED PERSONNEL MESSING SPACES,
– ESWBS 64321 – ENLISTED PERSONNEL MESSING SPACES,
– ESWBS 64400 – SANITARY SPACES AND FIXTURES,
– ESWBS 64410 – SPACES, SANITARY,
– ESWBS 64411 – SPACES, SANITARY,
– ESWBS 64500 – LEISURE AND COMMUNITY SPACES,
– ESWBS 64510 – LEISURE AND COMMUNITY SPACES,
– ESWBS 64511 – LEISURE AND COMMUNITY SPACES,
– ESWBS 6500 – AUXILIARY SYSTEMS,
– ESWBS 65000 – SERVICE SPACES,
– ESWBS 65100 – COMMISSARY SPACES,
– ESWBS 65110 – SPACES, COMMISSARY,
– ESWBS 65111 – SPACES, COMMISSARY,
– ESWBS 65200 – MEDICAL SPACES,
– ESWBS 65210 – FURNISHINGS AND EQUIPMENTS, MEDICAL SPACES,
– ESWBS 65211 – FURNISHINGS AND EQUIPMENTS, MEDICAL SPACES,
– ESWBS 65300 – DENTAL SPACES,
– ESWBS 65310 – FURNISHINGS AND EQUIPMENTS, DENTAL SPACES,
– ESWBS 65311 – FURNISHINGS AND EQUIPMENTS, DENTAL SPACES,
– ESWBS 65400 – UTILITY SPACES,
– ESWBS 65410 – UTILITY SPACE EQUIPMENT,
– ESWBS 65411 – UTILITY SPACE EQUIPMENT,
– ESWBS 65500 – LAUNDRY SPACES,
– ESWBS 65510 – SPACES, LAUNDRY AND DRY CLEANING,
– ESWBS 65511 – SPACES, LAUNDRY AND DRY CLEANING,
– ESWBS 65600 – TRASH DISPOSAL SPACES,
– ESWBS 65610 – TRASH DISPOSAL SPACES,
– ESWBS 65611 – TRASH DISPOSAL SPACES,
– ESWBS 6600 – OUTFITTING,
– ESWBS 66000 – WORKING SPACES,
– ESWBS 66100 – OFFICES,
– ESWBS 66110 – OFFICES,
– ESWBS 66111 – OFFICES,
– ESWBS 66200 – MACHINERY CONTROL CENTERS FURNISHINGS,
– ESWBS 66210 – MACHINERY CONTROL CENTERS FURNISHINGS,
– ESWBS 66211 – MACHINERY CONTROL CENTERS FURNISHINGS,
– ESWBS 66300 – ELECTRONICS CONTROL CENTERS FURNISHINGS,
– ESWBS 66310 – ELECTRONIC CONTROL CENTERS FURNISHINGS,
– ESWBS 66311 – ELECTRONIC CONTROL CENTERS FURNISHINGS,
– ESWBS 66400 – DAMAGE CONTROL STATIONS,
– ESWBS 66410 – DAMAGE CONTROL STATIONS,
– ESWBS 66411 – DAMAGE CONTROL STATIONS,
– ESWBS 66500 – WORKSHOPS, LABS, TEST AREAS (INCL PORTABLE TOOLS, EQUIP),
– ESWBS 66510 – WORKSHOPS, LABS, AND TEST AREAS, HULL, MECHANICAL, ELECT.,
– ESWBS 66511 – WORKSHOPS, LABS, AND TEST AREAS, HULL, MECHANICAL, ELECT.,
– ESWBS 66520 – WORKSHOPS, LABS, AND TEST AREAS, ELECTRONICS,
– ESWBS 66521 – WORKSHOPS, LABS, AND TEST AREAS, ELECTRONICS,
– ESWBS 66530 – WORKSHOPS, LABS, AND TEST AREAS, AVIATION RELATED,
– ESWBS 66531 – WORKSHOPS, LABS, AND TEST AREAS, AVIATION RELATED,
– ESWBS 66540 – WORKSHOPS, LABS, AND TEST AREAS, WEAPONS,
– ESWBS 66541 – WORKSHOPS, LABS, AND TEST AREAS, WEAPONS,
– ESWBS 6700 – WEAPONS,
– ESWBS 67000 – STOWAGE SPACES,
– ESWBS 67100 – LOCKERS AND SPECIAL STOWAGE,
– ESWBS 67110 – LOCKERS AND SPECIAL STOWAGE,
– ESWBS 67111 – LOCKERS AND SPECIAL STOWAGE,
– ESWBS 67200 – STOREROOMS AND ISSUE ROOMS,
– ESWBS 67210 – STOREROOMS AND ISSUE ROOMS,
– ESWBS 67211 – STOREROOMS,
– ESWBS 67212 – ISSUE ROOMS,
– ESWBS 67300 – CARGO STOWAGE,
– ESWBS 67310 – STOWAGE, CARGO,
– ESWBS 67311 – STOWAGE, CARGO,
– ESWBS 6800 – INTEGRATION AND ENGINEERING,
– ESWBS 6900 – SHIP ASSEMBLY,
– ESWBS 69000 – SPECIAL PURPOSE SYSTEMS,
– ESWBS 69100 – TRANSMISSION LOSS TREATMENT,
– ESWBS 69800 – OUTFIT AND FURNISHINGS OPERATING FLUIDS,
– ESWBS 69900 – OUTFIT AND FURNISH. REPAIR PARTS AND SPECIAL TOOLS,
– ESWBS 69910 – OUTFIT AND FURNISHINGS MISCELLANEOUS PARTS,
– ESWBS 69911 – OUTFIT AND FURNISHINGS MISCELLANEOUS PARTS,
– ESWBS 69920 – OUTFIT AND FURNISHINGS SPECIAL TOOLS,
– ESWBS 69921 – OUTFIT AND FURNISHINGS SPECIAL TOOLS,
– ESWBS 69921 – ,
– ESWBS 7000 – GENERAL REQUIREMENTS FOR DESIGN AND CONSTRUCTION,
– ESWBS 70000 – ARMAMENT, GENERAL,
– ESWBS 70100 – GENERAL ARRANGEMENT – WEAPONRY SYSTEMS,
– ESWBS 70200 – ARMAMENT INSTALLATIONS,
– ESWBS 70300 – WEAPONS HANDLING AND STOWAGE, GENERAL,
– ESWBS 7100 – ACCESS,
– ESWBS 71000 – GUNS AND AMMUNITION,
– ESWBS 71100 – GUNS,
– ESWBS 71110 – GUNS AND MOUNTS,
– ESWBS 71111 – GUNS AND MOUNTS,
– ESWBS 71120 – GUNS, SELF CONTAINED,
– ESWBS 71121 – GUNS, SELF-CONTAINED,
– ESWBS 71200 – AMMUNITION HANDLING,
– ESWBS 71210 – HANDLING, GUN AMMUNITION,
– ESWBS 71211 – HANDLING, GUN AMMUNITION,
– ESWBS 71300 – AMMUNITION STOWAGE,
– ESWBS 71310 – STOWAGE, GUN AMMUNITION,
– ESWBS 71311 – STOWAGE, GUN AMMUNITION,
– ESWBS 7200 – SURVIVABILITY (FORMERLY SHOCK, SEE INCLUDES LISTING),
– ESWBS 72000 – MISSILES AND ROCKETS,
– ESWBS 72100 – LAUNCHING DEVICES (MISSILES AND ROCKETS),
– ESWBS 72110 – LAUNCHING RAIL SYSTEMS, MISSILE,
– ESWBS 72111 – LAUNCHING RAIL SYSTEMS, MISSILE,
– ESWBS 72120 – LAUNCHING SYSTEMS, ASW/ASUW ROCKET,
– ESWBS 72121 – LAUNCHING SYSTEMS, ASW/ASUW ROCKET,
– ESWBS 72130 – COMBINED LAUNCHING, STWG AND HDLG SYS, MSL,
– ESWBS 72131 – COMBINED LAUNCHING, STWG AND HDLG SYS, MSL,
– ESWBS 72140 – MISSILE TUBES, SUBMARINES,
– ESWBS 72141 – MISSILE MOUNT TUBES,
– ESWBS 72142 – MISSILE LAUNCH TUBES,
– ESWBS 72200 – MISSILE, ROCKET, AND GUIDANCE CAPSULE HANDLING SYS.,
– ESWBS 72210 – HANDLING, MISSILE,
– ESWBS 72211 – HANDLING, MISSILE,
– ESWBS 72220 – HANDLING, ASW/ASUW ROCKET,
– ESWBS 72221 – HANDLING, ASW/ASUW ROCKET,
– ESWBS 72300 – MISSILE AND ROCKET STOWAGE,
– ESWBS 72310 – STOWAGE, MISSILE,
– ESWBS 72311 – STOWAGE, MISSILE,
– ESWBS 72320 – STOWAGE, ASW/ASUW ROCKET,
– ESWBS 72321 – STOWAGE, ASW/ASUW ROCKET,
– ESWBS 72400 – MISSILE HYDRAULICS,
– ESWBS 72410 – MISSILE HYDRAULICS,
– ESWBS 72411 – MISSILE HYDRAULICS,
– ESWBS 72500 – MISSILE GAS,
– ESWBS 72600 – MISSILE COMPENSATING,
– ESWBS 72610 – MISSILE COMPENSATING WATER SYSTEM (MCW),
– ESWBS 72611 – MISSILE COMPENSATING WATER SYSTEM (MCW),
– ESWBS 72700 – MISSILE LAUNCHER CONTROL,
– ESWBS 72800 – MISSILE HEATING, COOLING, TEMPERATURE CONTROL,
– ESWBS 72900 – MISSILE MONITORING, TEST AND ALIGNMENT,
– ESWBS 72931 – TEST INSTRUMENTATION (PERMANENT),
– ESWBS 72932 – TEST INSTRUMENTATION (TEMPORARY),
– ESWBS 7300 – NOISE AND VIBRATION,
– ESWBS 7400 – CASTING ,WELDING, RIVETING, ALLIED PROCESSES (GENERAL),
– ESWBS 7500 – THREADED FASTENERS STANDARDS,
– ESWBS 75400 – SUBMARINE TORPEDO EJECTION,
– ESWBS 7600 – RELIABILITY AND MAINTAINABILITY,
– ESWBS 76000 – SMALL ARMS AND PYROTECHNICS,
– ESWBS 76100 – SMALL ARMS AND PYROTECHNIC LAUNCHING DEVICES,
– ESWBS 76110 – SMALL ARMS AND PYROTECHNIC LAUNCHING DEVICES,
– ESWBS 76111 – SMALL ARMS AND PYROTECHNIC LAUNCHING DEVICES,
– ESWBS 76200 – SMALL ARMS AND PYROTECHNIC HANDLING,
– ESWBS 76210 – SMALL ARMS AND PYROTECHNIC HANDLING,
– ESWBS 76211 – SMALL ARMS AND PYROTECHNIC HANDLING,
– ESWBS 76300 – SMALL ARMS AND PYROTECHNIC STOWAGE,
– ESWBS 76310 – SMALL ARMS AND PYROTECHNIC STOWAGE,
– ESWBS 76311 – SMALL ARMS AND PYROTECHNIC STOWAGE,
– ESWBS 7700 – SAFETY,
– ESWBS 77000 – CARGO MUNITIONS,
– ESWBS 77200 – CARGO MUNITIONS HANDLING,
– ESWBS 77210 – HANDLING AND STOWAGE, AMMUNITION CARGO,
– ESWBS 77211 – HANDLING AND STOWAGE, AMMUNITION CARGO,
– ESWBS 77220 – AMMUNITION HANDLING ELEVATORS (NON-CV/CVN SHIPS),
– ESWBS 7722X – AMMUNITION HANDLING ELEVATORS (NON-CV/CVN SHIPS) – NO. X,
– ESWBS 77300 – CARGO MUNITIONS STOWAGE,
– ESWBS 7800 – MATERIALS,
– ESWBS 786XY – ELEVATOR HYDRAULIC POWER PLANTS – NO. XY,
– ESWBS 7900 – SEAWORTHINESS,
– ESWBS 79000 – SPECIAL PURPOSE SYSTEMS,
– ESWBS 79200 – SPECIAL WEAPONS HANDLING,
– ESWBS 79210 – ELEVATORS, SPECIAL WEAPONS (DELETED-SEE 7722X),
– ESWBS 79211 – ELEVATORS, SPECIAL WEAPONS – 10,000 LB AND ABOVE (DELETED),
– ESWBS 79212 – ELEVATORS, SPECIAL WEAPONS – 5,000 TO 10,000 LB (DELETED),
– ESWBS 79213 – ELEVATORS, SPECIAL WEAPONS – LESS THAN 5,000 LB (DELETED),
– ESWBS 79220 – HANDLING EQUIPMENT, SPECIAL WEAPONS,
– ESWBS 79221 – HANDLING EQUIPMENT, SPECIAL WEAPONS,
– ESWBS 79300 – SPECIAL WEAPONS STOWAGE,
– ESWBS 79310 – STOWAGE, SPECIAL WEAPONS,
– ESWBS 79311 – STOWAGE, SPECIAL WEAPONS,
– ESWBS 79700 – MISCELLANEOUS ORDNANCE SPACES,
– ESWBS 79800 – ARMAMENT OPERATING FLUIDS,
– ESWBS 79900 – ARMAMENT REPAIR PARTS AND SPECIAL TOOLS,
– ESWBS 79910 – ARMAMENT MISCELLANEOUS PARTS,
– ESWBS 79911 – ARMAMENT MISCELLANEOUS PARTS,
– ESWBS 79920 – ARMAMENT SPECIAL TOOLS,
– ESWBS 79921 – ARMAMENT SPECIAL TOOLS,
– ESWBS 79921 – ,
– ESWBS 8000 – INTEGRATED LOGISTIC SUPPORT REQUIREMENTS,
– ESWBS 80000 – INTEGRATION/ENGINEERING (SHIPBUILDER RESPONSE),
– ESWBS 8010 – INTEGRATED LOGISTIC SUPPORT PLANNING,
– ESWBS 80100 – SHIPBUILDERS INFORMATION DRAWINGS,
– ESWBS 8011 – INTEGRATED LOGISTIC SUPPORT PLANNING,
– ESWBS 8020 – DESIGN INTERFACE,
– ESWBS 80200 – CONTRACT DRAWINGS,
– ESWBS 8021 – LOGISTIC SUPPORT ANALYSIS,
– ESWBS 8022 – HUMAN ENGINEERING,
– ESWBS 80300 – STANDARD DRAWINGS,
– ESWBS 80400 – TYPE DRAWINGS,
– ESWBS 80600 – STUDY DRAWINGS,
– ESWBS 80700 – INSTALLATION CONTROL DRAWINGS,
– ESWBS 80800 – INTERFACE CONTROL DRAWINGS,
– ESWBS 8100 – MAINTENANCE PLANNING (FORMERLY MAINTENANCE),
– ESWBS 81000 – PRODUCTION ENGINEERING,
– ESWBS 81100 – CONFIGURATION MANAGEMENT (DELETED – SEE 8612 & 8613),
– ESWBS 81110 – CONTROL OF SHIP'S CONFIGURATION,
– ESWBS 81111 – CONTROL OF SHIP'S CONFIGURATION (DELETED – SEE 86131),
– ESWBS 81200 – CHANGE PROPOSALS, SCOPING AND SHIPCHECKING,
– ESWBS 81300 – PLANNING AND PRODUCTION CONTROL,
– ESWBS 81310 – PLANNING AND ESTIMATING SERVICES (NOT CHARGEABLE TO OVHD),
– ESWBS 81311 – PLANNING AND ESTIMATING SERVICES (NOT CHARGEABLE TO OVHD),
– ESWBS 81320 – SHIPYARD SFOMS ASSIST (DELETED – SEE 86421),
– ESWBS 81321 – SHIPYARD SFOMS ASSIST (DELETED – SEE 86421),
– ESWBS 81330 – SARP PREPARATION,
– ESWBS 81331 – SARP PREPARATION (DELETED – SEE 86281),
– ESWBS 8200 – SUPPORT EQUIPMENT (FORMERLY SPRT AND TEST EQPT, SEE INCLS),
– ESWBS 82000 – SPECIAL DRAWINGS FOR NUCLEAR PROPULSION SYSTEMS,
– ESWBS 8210 – GENERAL AND SPECIAL PURPOSE SUPPORT EQUIPMENT,
– ESWBS 8211 – GENERAL PURPOSE SUPPORT EQUIPMENT,
– ESWBS 8212 – SPECIAL PURPOSE SUPPORT EQUIPMENT,
– ESWBS 8220 – GENERAL AND SPECIAL PURPOSE TEST EQUIPMENT,
– ESWBS 8221 – TEST EQUIPMENT, GENERAL AND SPECIAL PURPOSE,
– ESWBS 8230 – GENERAL AND SPECIAL PURPOSE TOOLS,
– ESWBS 8231 – TOOLS, GENERAL AND SPECIAL PURPOSE,
– ESWBS 8300 – SUPPLY SUPPORT,
– ESWBS 83000 – DESIGN SUPPORT,
– ESWBS 83010 – SERVICES, DESIGN (NOT CHARGEABLE TO OVERHEAD),
– ESWBS 83011 – SERVICES, DESIGN (NOT CHARGEABLE TO OVERHEAD),
– ESWBS 83020 – SHIP'S SELECTED RECORDS,
– ESWBS 83021 – SHIP'S SELECTED RECORDS (DELETED – SEE 86131),
– ESWBS 83030 – SERVICES, REPRODUCTION,
– ESWBS 83031 – SERVICES, REPRODUCTION (DELETED – SEE 8614),
– ESWBS 83100 – CONSTRUCTION DRAWINGS,
– ESWBS 83200 – SPECIFICATIONS,
– ESWBS 83300 – MASS PROPERTIES ENGINEERING,
– ESWBS 83400 – COMPUTER PROGRAMS,
– ESWBS 83500 – ENGINEERING CALCULATIONS,
– ESWBS 83600 – MODELS AND MOCKUPS,
– ESWBS 83700 – PHOTOGRAPHS,
– ESWBS 83710 – SERVICES, SPECIAL PHOTOGRAPHIC,
– ESWBS 83711 – SERVICES, SPECIAL PHOTOGRAPHIC (DELETED – SEE 86171),
– ESWBS 83800 – DESIGN/ENGINEERING LIAISON (DELETED – SEE 8612 & 8613),
– ESWBS 83810 – WATERFRONT LIAISON ENGINEERING SERVICE,
– ESWBS 83811 – WATERFRONT LIAISON ENGINEERING SERVICE (SEE 8612),
– ESWBS 83900 – LOFTING,
– ESWBS 8400 – PACKAGING, HANDLING, STORAGE AND TRANSPORTATION,
– ESWBS 84000 – QUALITY ASSURANCE,
– ESWBS 8410 – TRANSPORTATION MODES,
– ESWBS 84100 – TESTS AND INSPECTION, CRITERIA, AND PROCEDURES,
– ESWBS 8411 – TRANSPORTATION MODES,
– ESWBS 84110 – TEST PREPARATION AND TEST COORDINATION,
– ESWBS 84111 – TEST PREPARATION AND TEST COORDINATION,
– ESWBS 8420 – SPECIAL HANDING EQUIPMENT,
– ESWBS 84200 – TRIALS AGENDA PREPARATION, DATA COLLECTION AND ANAL.,
– ESWBS 8421 – SPECIAL HANDING EQUIPMENT,
– ESWBS 8430 – HANDLING, PACKAGING AND STORAGE,
– ESWBS 84300 – INCLINING EXPERIMENT AND TRIM DIVE (DELETED – SEE 86861),
– ESWBS 8431 – HANDLING, PACKAGING AND STORAGE,
– ESWBS 84310 – INCLINING EXPERIMENT, WEIGHT, STABILITY, AND REBALLASTING,
– ESWBS 84311 – INCLINING EXPERIMENT, WEIGHT, STABILITY, AND REBALLASTING,
– ESWBS 84400 – COMBAT SYSTEMS CHECKOUT CRITERIA AND PROCEDURES,
– ESWBS 84410 – COMBAT SYSTEMS LIAISON SERVICES, WATERFRONT,
– ESWBS 84411 – COMBAT SYSTEMS TEST PLANNING SERVICES,
– ESWBS 84412 – COMBAT SYSTEMS WATERFRONT LIAISON SERVICES,
– ESWBS 84420 – COMBAT SYSTEMS ALIGNMENT,
– ESWBS 84421 – COMBAT SYSTEMS ALIGNMENT (DELETED – SEE 86113),
– ESWBS 84430 – TEST, INTEGRATED COMBAT SYSTEMS,
– ESWBS 84431 – TEST, INTEGRATED COMBAT SYSTEMS (DELETED – SEE 86721),
– ESWBS 84500 – CERTIFICATION STANDARDS,
– ESWBS 8500 – ENGINEERING DRAWINGS,
– ESWBS 85000 – INTEGRATED LOGISTIC SUPPORT ENGINEERING,
– ESWBS 85100 – MAINTENANCE,
– ESWBS 85200 – SUPPORT AND TEST EQUIPMENT,
– ESWBS 85300 – SUPPLY SUPPORT (DELETED – SEE 8643),
– ESWBS 85310 – SUPPLY OPERATION (OVERHAUL) ASSTN PRGM (SOAP), SY ASSTN TO,
– ESWBS 85311 – SUPPLY OPERATION (OVERHAUL) ASSTN PRGM (SOAP), SY ASSTN TO,
– ESWBS 85320 – CONSOLIDATED SHIP'S ALLOWANCE LIST (COSAL),
– ESWBS 85321 – CONSOLIDATED SHIP'S ALLOWANCE LIST (COSAL),
– ESWBS 85330 – SUPPLIES, CONSUMABLE SHIPS FORCE,
– ESWBS 85331 – SUPPLIES, CONSUMABLE SHIPS FORCE,
– ESWBS 85400 – TRANSPORTATION,
– ESWBS 85500 – ENGINEERING DRAWINGS AND SPECIFICATIONS,
– ESWBS 85600 – TECHNICAL MANUALS AND OTHER DATA,
– ESWBS 85700 – FACILITIES (DELETED – SEE 8637),
– ESWBS 85710 – FACILITIES SUPPORT,
– ESWBS 85711 – FACILITIES SUPPORT (DELETED – SEE 8637),
– ESWBS 85800 – PERSONNEL AND TRAINING,
– ESWBS 85900 – TRAINING EQUIPMENT,
– ESWBS 8600 – TECHNICAL MANUALS AND OTHER DATA,
– ESWBS 86000 – SUPPORT SERVICES,
– ESWBS 86010 – GUARANTEE ENGINEER SERVICES,
– ESWBS 86011 – GUARANTEE ENGINEER SERVICES,
– ESWBS 86020 – MAINTENANCE PROGRAMS AND STANDARDS,
– ESWBS 86021 – MAINTENANCE PROGRAMS AND STANDARDS,
– ESWBS 86030 – MANAGEMENT REPORTS,
– ESWBS 86031 – MANAGEMENT REPORTS,
– ESWBS 86040 – MATERIAL MANAGEMENT,
– ESWBS 86041 – MATERIAL MANAGEMENT,
– ESWBS 86050 – OPEN AND INSPECT REQUIREMENTS (FORMERLY 984),
– ESWBS 86051 – OPEN AND INSPECT REQUIREMENTS,
– ESWBS 86060 – QUALITY ASSURANCE REQUIREMENTS,
– ESWBS 86061 – QUALITY ASSURANCE REQUIREMENTS,
– ESWBS 86070 – TECHNICAL REQUIREMENTS,
– ESWBS 86071 – TECHNICAL REQUIREMENTS,
– ESWBS 86080 – WORK REQUIREMENTS COMMON TO ALL SHIP SYSTEMS,
– ESWBS 86081 – WORK REQUIREMENTS COMMON TO ALL SHIP SYSTEMS,
– ESWBS 86100 – ENGINEERING AND DESIGN SUPPORT,
– ESWBS 86110 – COMBAT SYSTEMS OFFICE SERVICES (FORMERLY 844),
– ESWBS 86111 – COMBAT SYSTEMS OFFICE SERVICES (TYCOM),
– ESWBS 86112 – COMBAT SYSTEMS OFFICE SERVICES (NAVSEA),
– ESWBS 86113 – COMBAT SYSTEMS ALIGNMENT,
– ESWBS 86120 – DESIGN DIVISION SERVICES (FORMERLY IN 811),
– ESWBS 86121 – DESIGN DIVISION SERVICES (TYCOM),
– ESWBS 86122 – DESIGN DIVISION SERVICES (NAVSEA),
– ESWBS 86130 – DESIGN DIVISION SERVICES (DSA),
– ESWBS 86131 – DESIGN DIVISION SERVICES (DSA),
– ESWBS 86140 – REPRODUCTION SERVICES,
– ESWBS 86141 – REPRODUCTION SERVICES (TYCOM) (FORMERLY IN 83031),
– ESWBS 86142 – REPRODUCTION SERVICES (NAVSEA) (FORMERLY IN 83031),
– ESWBS 86150 – PRODUCTION ENGINEERING SERVICES,
– ESWBS 86151 – PRODUCTION ENGINEERING SERVICES,
– ESWBS 86160 – WELDING ENGINEERING SERVICES,
– ESWBS 86161 – WELDING ENGINEERING SERVICES,
– ESWBS 86170 – SPECIAL PHOTOGRAPHIC SERVICES,
– ESWBS 86171 – SPECIAL PHOTOGRAPHIC SERVICES (FORMERLY IN 83711),
– ESWBS 86200 – PRE-AVAILABILITY PLANNING,
– ESWBS 86210 – SHIPCHECKS (PLANNER AND ESTIMATOR),
– ESWBS 86211 – SHIPCHECKS (PLANNER AND ESTIMATOR) (TYCOM),
– ESWBS 86212 – SHIPCHECKS (PLANNER AND ESTIMATOR) (NAVSEA),
– ESWBS 86220 – ARRIVAL INSPECTION OF SHIPS,
– ESWBS 86221 – ARRIVAL INSPECTION OF SHIPS,
– ESWBS 86230 – PLANNING AND ESTIMATING SERVICES NOT CHARGEABLE TO OVHD,
– ESWBS 86231 – PLANNING AND ESTIMATING SERVICES NOT CHARGEABLE TO OVHD,
– ESWBS 86240 – PRE-AVAILABILITY TESTING,
– ESWBS 86241 – PRE-OVERHAUL TESTS AND INSPECTIONS (POT&I) (FORMERLY 9861),
– ESWBS 86242 – PRE-AVAILABILITY ACOUSTIC SURVEYS,
– ESWBS 86243 – HULL VIBRATION SURVEY (FORMERLY 98251),
– ESWBS 86250 – PRE-AVAILABILITY ORDNANCE & ELECTRONICS INSPECTIONS,
– ESWBS 86251 – PRE-AVAILABILITY ORDNANCE & ELECTRONICS INSPECTIONS,
– ESWBS 86280 – SARP PREPARATION,
– ESWBS 86281 – SARP PREPARATION (FORMERLY IN 81331),
– ESWBS 86300 – SHIP HANDLING AND WORKSITE PREPARATION,
– ESWBS 86310 – BERTHING AND MOORING SERVICES,
– ESWBS 86311 – BERTHING AND MOORING SERVICES,
– ESWBS 86320 – WEIGHT CONTROL DURING OFFLOAD,
– ESWBS 86321 – WEIGHT CONTROL DURING OFFLOAD (FORMERLY IN 987),
– ESWBS 86330 – PREPARING SHIP FOR AVAILABILITY,
– ESWBS 86331 – PREPARING SHIP FOR AVAILABILITY,
– ESWBS 86340 – DOCKING AND UNDOCKING,
– ESWBS 86341 – DOCKING AND UNDOCKING (FORMERLY IN 997),
– ESWBS 86350 – TEMPORARY SERVICES,
– ESWBS 86351 – TEMPORARY SHIP SYSTEMS (FORMERLY IN 992),
– ESWBS 86352 – TEMPORARY PRODUCTION UTILITIES (PRORATED),
– ESWBS 86360 – TEMPORARY ACCESS OPENINGS,
– ESWBS 86361 – TEMPORARY ACCESS OPENINGS (FORMERLY IN 1001),
– ESWBS 86370 – FACILITIES SUPPORT,
– ESWBS 86371 – FACILITIES SUPPORT (FORMERLY 857),
– ESWBS 86400 – SHIP SUPPORT (FORMERLY IN 980),
– ESWBS 86410 – ASSIST SHIP'S FORCE,
– ESWBS 86411 – ASSIST SHIP'S FORCE (FORMERLY 98011),
– ESWBS 86420 – ASSISTANCE TO FLEET MANAGEMENT SYSTEM – REAL TIME (FMS-RT),
– ESWBS 86421 – ASSISTANCE TO FLEET MANAGEMENT SYSTEM – REAL TIME (FMS-RT),
– ESWBS 86430 – SUPPLY SUPPORT (FORMERLY 853),
– ESWBS 86431 – INTEGRATED LOGISTICS OVERHAUL (FORMERLY SOAP),
– ESWBS 86432 – CONSOLIDATED SHIP'S ALLOWANCE LIST (FORMERLY 85321),
– ESWBS 86440 – CLEANING SERVICES (FORMERLY 994),
– ESWBS 86441 – CLEANING SHIP SERVICES,
– ESWBS 86442 – BILGE CLEANING AND GAS FREEING ENGINEERING SPACES,
– ESWBS 86450 – PREVENTIVE MAINTENANCE (FORMERLY 9941),
– ESWBS 86451 – PREVENTIVE MAINTENANCE,
– ESWBS 86460 – INTEGRATED AVAILABILITY MANAGEMENT,
– ESWBS 86461 – INTEGRATED AVAILABILITY MANAGEMENT CENTER (FORMERLY 98034),
– ESWBS 86470 – SUPPLIES, CONSUMABLE SHIP'S FORCE,
– ESWBS 86471 – SUPPLIES, CONSUMABLE SHIP'S FORCE (FORMERLY 85331),
– ESWBS 86480 – MISCELLANEOUS,
– ESWBS 86481 – GAUGES AND THERMOMETERS, CALIBRATION OF (FORMERLY 98021),
– ESWBS 86482 – VALVE HANDWHEELS (FORMERLY 98041),
– ESWBS 86483 – TESTING, RELIEF VALVE (FORMERLY 98051),
– ESWBS 86490 – CARE AND PRESERVATION,
– ESWBS 86491 – CARE AND PRESERVATION (FORMERLY IN 9933),
– ESWBS 86500 – PRODUCTION SERVICES AND SUPPORT (FORMERLY IN 980,993),
– ESWBS 86510 – STAGING AND SCAFFOLDING (FORMERLY IN 991),
– ESWBS 86511 – STAGING AND SCAFFOLDING (SHIPYARD WORK),
– ESWBS 86512 – STAGING AND SCAFFOLDING (SHIP'S FORCE WORK),
– ESWBS 86520 – CRANES AND TRANSPORTATION SERVICES (PRORATED),
– ESWBS 86521 – CRANES AND TRANSPORTATION SERVICES (PRORATED),
– ESWBS 86530 – RIGGING SERVICES (PRORATED),
– ESWBS 86531 – RIGGING SERVICES (PRORATED) (FORMERLY IN 993),
– ESWBS 86540 – DEGREASING AND PRESERVATION,
– ESWBS 86541 – DEGREASING AND PRESERVATION,
– ESWBS 86550 – LAGGING,
– ESWBS 86551 – LAGGING – PIPING AND MACHINERY,
– ESWBS 86552 – ASBESTOS LAGGING AND THERMAL INSULATION,
– ESWBS 86560 – MINOR ASSIST WORK (PRORATED),
– ESWBS 86561 – ELECTRICAL MINOR ASSIST WORK (PRORATED),
– ESWBS 86562 – SHIPFITTER MINOR ASSIST WORK (PRORATED),
– ESWBS 86563 – WELDING AND BURNING MINOR ASSIST WORK (PRORATED),
– ESWBS 86564 – SHIPWRIGHT MINOR ASSIST WORK (PRORATED),
– ESWBS 86565 – SHEETMETAL MINOR ASSIST WORK (PRORATED),
– ESWBS 86566 – INSIDE MACHINE SHOP MINOR ASSIST WORK (PRORATED),
– ESWBS 86570 – FIREWATCH SERVICES (PRORATED),
– ESWBS 86571 – FIREWATCH SERVICES (PRORATED),
– ESWBS 86580 – GUARANTEE ENGINEER,
– ESWBS 86581 – GUARANTEE ENGINEER (FORMERLY 98311),
– ESWBS 86590 – OCCUPATIONAL SAFETY AND HEALTH (OSH) (FORMALLY 50815),
– ESWBS 86591 – OCCUPATIONAL SAFETY AND HEALTH (OSH) (FORMALLY 50815),
– ESWBS 86600 – INSPECTION AND QUALITY CONTROL (FORMERLY IN 841 & 986),
– ESWBS 86620 – QUALITY ASSURANCE SERVICES (PRORATED),
– ESWBS 86621 – QUALITY ASSURANCE SERVICES (PRORATED) (FORMERLY IN 98631),
– ESWBS 86630 – LABORATORY SERVICES,
– ESWBS 86631 – LABORATORY SERVICES (FORMERLY IN 98621),
– ESWBS 86640 – NON-DESTRUCTIVE TESTING,
– ESWBS 86641 – NON-DESTRUCTIVE TESTING,
– ESWBS 86650 – WELD SURVEILLANCE (HY-80),
– ESWBS 86651 – WELD SURVEILLANCE (HY-80),
– ESWBS 86660 – AERP COMPONENT TESTING,
– ESWBS 86661 – AERP COMPONENT TESTING,
– ESWBS 86700 – SHIPBOARD TEST PROGRAM (FORMERLY IN 841),
– ESWBS 86710 – ENGINE ROOM STEAM TESTING PROGRAM,
– ESWBS 86711 – ENGINE ROOM STEAM TESTING PROGRAM (FORMERLY IN 99241),
– ESWBS 86720 – INTEGRATED COMBAT SYSTEMS TESTING (FORMERLY 8443),
– ESWBS 86721 – INTEGRATED COMBAT SYSTEMS TESTING,
– ESWBS 86730 – INTEGRATED AVAILABILITY TEST PROGRAM (HP&A),
– ESWBS 86731 – INTEGRATED AVAILABILITY TEST PROGRAM (HP&A) (WAS 84111),
– ESWBS 86740 – POST-REPAIR ACOUSTIC SURVEYS,
– ESWBS 86741 – POST-REPAIR ACOUSTIC SURVEYS,
– ESWBS 86750 – SHIFT TEST DIRECTORS (CSO) (PRORATED),
– ESWBS 86751 – SHIFT TEST DIRECTORS (CSO) (PRORATED),
– ESWBS 86760 – SHIFT TEST DIRECTORS (HP&A) (PRORATED),
– ESWBS 86761 – SHIFT TEST DIRECTORS (HP&A) (PRORATED),
– ESWBS 86770 – STANDARDIZED ASW TEST PROGRAM,
– ESWBS 86771 – STANDARDIZED ASW TEST PROGRAM,
– ESWBS 86780 – INTEGRATED RADIO SYSTEMS TESTING (FORMERLY 4401),
– ESWBS 86781 – INTEGRATED RADIO SYSTEMS TESTING,
– ESWBS 86800 – TRIALS AND CERTIFICATION (FORMERLY 868),
– ESWBS 86810 – PRE-TEST CERTIFICATION OF SHIP SYSTEMS,
– ESWBS 86811 – PRE-TEST CERTIFICATION OF SHIP SYSTEMS,
– ESWBS 86820 – PORSE AND CREW CERTIFICATION,
– ESWBS 86821 – PORSE AND CREW CERTIFICATION,
– ESWBS 86830 – LIGHT-OFF EXAM (LOE) AND CREW CERTIFICATION,
– ESWBS 86831 – PRE-PEB/LOE INSPECTION AND DISCREPANCY CORRECTION,
– ESWBS 86832 – PEB/LOE DISCREPANCY CORRECTION (FORMERLY 98221),
– ESWBS 86840 – DOCK TRIALS AND FAST CRUISE,
– ESWBS 86841 – DOCK TRIALS AND FAST CRUISE (FORMERLY 98231),
– ESWBS 86842 – DOCK TRIALS AND FAST CRUISE DISCREPANCY CORRECTION,
– ESWBS 86850 – SEA TRIALS,
– ESWBS 86851 – SEA TRIALS (FORMERLY IN 843 & 98231),
– ESWBS 86852 – SEA TRIAL DISCREPANCY CORRECTION (FORMERLY 98241),
– ESWBS 86860 – POST-AVAILABILITY INCLINING EXPERIMENT (NAVSEA),
– ESWBS 86861 – POST-AVAILABILITY INCLINING EXPERIMENT (NAVSEA),
– ESWBS 86870 – AVAILABILITY ANALYSIS AND REPORT,
– ESWBS 86871 – AVAILABILITY ANALYSIS AND REPORT,
– ESWBS 86900 – RESERVED FOR FUTURE USE,
– ESWBS 8700 – FACILITIES,
– ESWBS 8800 – MANPOWER AND PERSONNEL,
– ESWBS 88000 – AUTHORIZED REPAIR PLANNING,
– ESWBS 88100 – FUNDS,
– ESWBS 88110 – FUNDS RESERVATION (GROWTH),
– ESWBS 88111 – FUNDS RESERVATION (GROWTH),
– ESWBS 88120 – FUNDS RESERVATION (NEW WORK),
– ESWBS 88121 – FUNDS RESERVATION (NEW WORK),
– ESWBS 8900 – TRAINING AND TRAINING SUPPORT(FORMERLY TRAINING EQUIPMENT),
– ESWBS 89000 – SPECIAL PURPOSE ITEMS,
– ESWBS 89100 – SAFETY,
– ESWBS 89200 – HUMAN FACTORS,
– ESWBS 89300 – STANDARDIZATION,
– ESWBS 89400 – VALUE ENGINEERING,
– ESWBS 89500 – RELIABILITY AND MAINTAINABILITY,
– ESWBS 89600 – DATA MANAGEMENT,
– ESWBS 89700 – PROJECT MANAGEMENT,
– ESWBS 89700 – ,
– ESWBS 9000 – QUALITY ASSURANCE (FORMERLY QUALITY ASSURANCE REQT),
– ESWBS 90000 – SHIP ASSEMBLY AND SUPPORT SERVICES,
– ESWBS 90100 – 901 THRU 979 RESERVED FOR IDENT. OF ASSEMBLIES,
– ESWBS 9100 – SHIP INSPECTIONS,
– ESWBS 9200 – SHIP TESTS,
– ESWBS 9300 – COMBAT SYSTEMS CHECKOUT,
– ESWBS 9400 – REGULAR SHIP TRIALS,
– ESWBS 9500 – WHOLE SHIP TESTING,
– ESWBS 9600 – MASS PROPERTIES CONTROL,
– ESWBS 9700 – INCLINING EXPERIMENT AND TRIM DIVE,
– ESWBS 9800 – MODELS AND MOCKUPS,
– ESWBS 98000 – CONTRACTUAL AND PRODUCTION SUPPORT SERVICE,
– ESWBS 98010 – ASSIST SHIP'S FORCE,
– ESWBS 98011 – ASSIST SHIP'S FORCE (DELETED – SEE 86411),
– ESWBS 98020 – GAUGES AND THERMOMETERS, CALIBRATION OF,
– ESWBS 98021 – GAUGES AND THERMOMETERS, CALIBRATION OF,
– ESWBS 98030 – PRODUCTION SUPPORT, INTEGRATED OVERHAUL MANAGEMENT CENTER,
– ESWBS 98031 – PRODUCTION SUPPORT, INTEGRATED OVERHAUL MANAGEMENT CENTER,
– ESWBS 98040 – VALVE HANDWHEELS,
– ESWBS 98041 – VALVE HANDWHEELS (DELETED – SEE 86482),
– ESWBS 98050 – TESTING, RELIEF VALVES,
– ESWBS 98051 – TESTING, RELIEF VALVES (DELETED – SEE 86483),
– ESWBS 98100 – INSURANCE,
– ESWBS 98200 – TRIALS (DELETED – SEE 868),
– ESWBS 98210 – DISCREPANCY CORRECTIONS AND INSPECTION, PRE PEB/LOE,
– ESWBS 98211 – DISCREPANCY CORRECTIONS AND INSPECTION, PRE PEB/LOE,
– ESWBS 98220 – DISCREPANCY CORRECTIONS, PEB/LOE,
– ESWBS 98221 – DISCREPANCY CORRECTIONS, PEB/LOE (DELETED – SEE 86832),
– ESWBS 98230 – DOCK AND SEA TRIALS,
– ESWBS 98231 – DOCK AND SEA TRIALS,
– ESWBS 98240 – DISCREPANCY CORRECTIONS, DOCK AND SEA TRIAL,
– ESWBS 98241 – DISCREPANCY CORRECTIONS, DOCK AND SEA TRIALS,
– ESWBS 98250 – HULL VIBRATION SURVEY,
– ESWBS 98251 – HULL VIBRATION SURVEY (DELETED – SEE 86243),
– ESWBS 98300 – DELIVERY,
– ESWBS 98310 – GUARANTEE ENGINEER,
– ESWBS 98311 – GUARANTEE ENGINEER (DELETED – SEE 86581),
– ESWBS 98400 – OPEN AND INSPECT (CONVERSIONS ONLY) (DELETED – SEE 8605),
– ESWBS 98500 – FIRE AND FLOODING PROTECTION (DELETED – SEE 865),
– ESWBS 98600 – TESTS AND INSPECTION (DELETED – SEE 866),
– ESWBS 98610 – PRE-OVERHAUL TESTS AND INSPECTION (POT&I),
– ESWBS 98611 – PRE-OVERHAUL TESTS AND INSPECTION (POT&I),
– ESWBS 98620 – OIL AND WATER SAMPLE ANALYSIS,
– ESWBS 98621 – OIL AND WATER SAMPLE ANALYSIS (DELETED – SEE 86631),
– ESWBS 98630 – QUALITY ASSURANCE SERVICES,
– ESWBS 98631 – QUALITY ASSURANCE SERVICES (DELETED – SEE 86621),
– ESWBS 98700 – WEIGHING AND RECORDING (DELETED – SEE 8632),
– ESWBS 98800 – CONTRACT DATA REQUIREMENTS (ADMINISTRATION),
– ESWBS 98900 – FITTING-OUT,
– ESWBS 9900 – PHOTOGRAPHS,
– ESWBS 99000 – CONSTRUCTION SUPPORT,
– ESWBS 99100 – STAGING, SCAFFOLDING, AND CRIBBING,
– ESWBS 99110 – STAGING FOR ROUTINE WORK,
– ESWBS 99111 – STAGING FOR SHIPYARD WORK,
– ESWBS 99112 – STAGING FOR SHIP'S FORCE WORK,
– ESWBS 99200 – TEMPORARY UTILITIES AND SERVICES (DELETED – SEE 8635),
– ESWBS 99210 – TEMPORARY UTILITIES AND SERVICES (PRORATABLE),
– ESWBS 99211 – TEMPORARY UTILITIES AND SERVICES (PRORATABLE),
– ESWBS 99220 – TEMPORARY UTILITIES AND SERVICES (NONPRORATABLE),
– ESWBS 99221 – TEMPORARY UTILITIES AND SERVICES (NONPRORATABLE),
– ESWBS 99230 – BILGE CLEANING AND GAS FREEING, MACHINERY SPACES,
– ESWBS 99231 – BILGE CLEANING AND GAS FREEING, MACHINERY SPACES,
– ESWBS 99240 – TEMPORARY STEAM BARGE SERVICES,
– ESWBS 99241 – TEMPORARY STEAM BARGE SERVICES (DELETED – 86711),
– ESWBS 99300 – MATERIAL HANDLING AND REMOVAL (DELETED – SEE 865),
– ESWBS 99310 – SERVICES, CRANE AND RIGGING SY SUPPORT,
– ESWBS 99311 – SERVICES, CRANE AND RIGGING SY SUPPORT,
– ESWBS 99320 – SERVICES, CRANE AND RIGGING SF SUPPORT,
– ESWBS 99321 – SERVICES, CRANE AND RIGGING SF SUPPORT,
– ESWBS 99330 – CARE AND PRESERVATION,
– ESWBS 99331 – CARE AND PRESERVATION (DELETED – SEE 86491),
– ESWBS 99400 – CLEANING SERVICES (DELETED – SEE 8644),
– ESWBS 99410 – PREVENTIVE MAINTENANCE,
– ESWBS 99411 – PREVENTIVE MAINTENANCE (DELETED – SEE 8644),
– ESWBS 99500 – MOLDS AND TEMPLATES, JIGS, FIXTURES, AND SPEC. TOOLS,
– ESWBS 99600 – LAUNCHING,
– ESWBS 99700 – DRYDOCKING (DELETED – SEE 8634),
– ESWBS 99710 – DOCK AND UNDOCK SHIP,
– ESWBS 99711 – DOCK AND UNDOCK SHIP (DELETED – SEE 86341),
Contact our Customer Care Center today for quotations and orders.
Shipcare+ South Korea
[email protected]
www.shipcare.kr